{"id":903,"date":"2023-02-22T17:21:37","date_gmt":"2023-02-22T22:21:37","guid":{"rendered":"http:\/\/core.loc\/development\/?page_id=197"},"modified":"2023-10-28T02:36:44","modified_gmt":"2023-10-28T06:36:44","slug":"k-record-drawing-sample","status":"publish","type":"page","link":"https:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/k-record-drawing-sample\/","title":{"rendered":"K. Record Drawing Sample"},"content":{"rendered":"\n<p>Along with the Construction Certification Package, the Philadelphia Water Department&nbsp;(PWD) requires that Record Drawing(s) be submitted at the close of the project to ensure that the stormwater management practices (SMPs) and their elements were constructed in general accordance with the Approved Post\u2011Construction Stormwater Management Plan (PCSMP), and to document any field changes. Record Drawing(s) are required for SMP verification and are a key component of PWD\u2019s compliance reporting and post-construction inspection procedures. Samples demonstrating how Approved PCSMP plan sheets should be marked-up in order to prepare Record Drawings are provided in Appendix&nbsp;K.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/water.phila.gov\/wp-content\/uploads\/files\/appendix-k-record-drawing-sample.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Record Drawing Sample<\/a>&nbsp;(PDF)<\/li>\n\n\n\n<li><a href=\"https:\/\/water.phila.gov\/wp-content\/uploads\/files\/appendix-k-record-drawing-sample-construction-details.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Record Drawing Sample Construction Details<\/a>&nbsp;(PDF)<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Along with the Construction Certification Package, the Philadelphia Water Department&nbsp;(PWD) requires that Record Drawing(s) be submitted at the close of the project to ensure that the stormwater management practices (SMPs) and their elements were constructed in general accordance with the Approved Post\u2011Construction Stormwater Management Plan (PCSMP), and to document any field changes. Record Drawing(s) are [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":53,"menu_order":11,"comment_status":"closed","ping_status":"closed","template":"page-manual.php","meta":{"custom_css":"","custom_js":"","dp_submitted":"0","dp_notify":"0","dp_created":"","version":"","effective":"","short-page-title":"","pwd_rlv_phrase_match":"k record drawing sample | k record drawing sample | along with the construction certification package the philadelphia water department pwd requires that record drawing s be submitted at the close of the project to ensure that the stormwater management practices smps and their elements were constructed in general accordance with the approved post construction stormwater management plan pcsmp and to document any field changes record drawing s are required for smp verification and are a key component of pwds compliance reporting and post construction inspection procedures samples demonstrating how approved pcsmp plan sheets should be marked up in order to prepare record drawings are provided in appendix k | record drawing sample pdf | record drawing sample construction details pdf","pwd_rlv_wordcount":"109"},"section":[],"class_list":["post-903","page","type-page","status-publish","hentry","wpautop"],"acf":[],"parsely":{"version":"1.1.0","canonical_url":"https:\/\/phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/k-record-drawing-sample\/","smart_links":{"inbound":0,"outbound":0},"traffic_boost_suggestions_count":0,"meta":{"@context":"https:\/\/schema.org","@type":"WebPage","headline":"K. Record Drawing Sample","url":"http:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/k-record-drawing-sample\/","mainEntityOfPage":{"@type":"WebPage","@id":"http:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/k-record-drawing-sample\/"},"thumbnailUrl":"","image":{"@type":"ImageObject","url":""},"articleSection":"Uncategorized","author":[{"@type":"Person","name":"Lauren Sell"}],"creator":["Lauren Sell"],"publisher":{"@type":"Organization","name":"Development Services","logo":""},"keywords":[],"dateCreated":"2023-02-22T22:21:37Z","datePublished":"2023-02-22T22:21:37Z","dateModified":"2023-10-28T06:36:44Z"},"rendered":"<script type=\"application\/ld+json\" class=\"wp-parsely-metadata\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@type\":\"WebPage\",\"headline\":\"K. Record Drawing Sample\",\"url\":\"http:\\\/\\\/water.phila.gov\\\/development\\\/stormwater-plan-review\\\/manual\\\/appendices\\\/k-record-drawing-sample\\\/\",\"mainEntityOfPage\":{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/water.phila.gov\\\/development\\\/stormwater-plan-review\\\/manual\\\/appendices\\\/k-record-drawing-sample\\\/\"},\"thumbnailUrl\":\"\",\"image\":{\"@type\":\"ImageObject\",\"url\":\"\"},\"articleSection\":\"Uncategorized\",\"author\":[{\"@type\":\"Person\",\"name\":\"Lauren Sell\"}],\"creator\":[\"Lauren Sell\"],\"publisher\":{\"@type\":\"Organization\",\"name\":\"Development Services\",\"logo\":\"\"},\"keywords\":[],\"dateCreated\":\"2023-02-22T22:21:37Z\",\"datePublished\":\"2023-02-22T22:21:37Z\",\"dateModified\":\"2023-10-28T06:36:44Z\"}<\/script>","tracker_url":"https:\/\/cdn.parsely.com\/keys\/phila.gov\/p.js"},"_links":{"self":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages\/903","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/comments?post=903"}],"version-history":[{"count":0,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages\/903\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages\/53"}],"wp:attachment":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/media?parent=903"}],"wp:term":[{"taxonomy":"section","embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/section?post=903"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}