{"id":904,"date":"2023-02-22T17:21:42","date_gmt":"2023-02-22T22:21:42","guid":{"rendered":"http:\/\/core.loc\/development\/?page_id=198"},"modified":"2023-10-28T02:36:46","modified_gmt":"2023-10-28T06:36:46","slug":"l-standard-details","status":"publish","type":"page","link":"https:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/l-standard-details\/","title":{"rendered":"L. Standard Details"},"content":{"rendered":"\n<p>Typical construction details for several SMPs, including all of PWD\u2019s highest-preference SMPs, such as bioinfiltration\/bioretention basins, porous pavement, and green roof, and for SMP-related structures, such as cleanouts, observations wells, and outlet control structures, are available for download in AutoCAD (*.dwg) format in Appendix&nbsp;L. These Standard Details incorporate design specifications pursuant to each SMP\u2019s respective design and material requirements. The designer is encouraged, not required, to use them for PCSMP creation when possible.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/water.phila.gov\/wp-content\/uploads\/files\/pwd-stormwater-standard-details.zip\">Standard Details (ALL)<\/a>\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/water.phila.gov\/wp-content\/uploads\/files\/stormwater-details-bio-basin.dwg\">Bioinfiltration\/Bioretention Basin Standard Detail<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/water.phila.gov\/wp-content\/uploads\/files\/stormwater-details-cleanout.dwg\">Cleanout Standard Detail<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/water.phila.gov\/wp-content\/uploads\/files\/cleanout-in-right-of-way-standard-detail.dwg\">Cleanout in Right-of-Way Standard Detail<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/water.phila.gov\/wp-content\/uploads\/files\/double-manhole-outlet-control-structure-standard-detail.dwg\">Double Manhole Outlet Control Structure Standard Detail<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/water.phila.gov\/wp-content\/uploads\/files\/stormwater-details-green-roof.dwg\">Green Roof Standard Detail<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/water.phila.gov\/wp-content\/uploads\/files\/observation-well-standard-detail.dwg\">Observation Well Standard Detail<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/water.phila.gov\/wp-content\/uploads\/files\/porous-pavement-standard-detail.dwg\">Porous Pavement Standard Detail<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/water.phila.gov\/wp-content\/uploads\/files\/riser-outlet-control-structure-standard-detail.dwg\">Riser Outlet Control Structure Standard Detail<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/water.phila.gov\/wp-content\/uploads\/files\/stormwater-details-subsurface-infiltration-basin.dwg\">Subsurface Infiltration Basin (Pipe in Stone) Standard Detail<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/water.phila.gov\/wp-content\/uploads\/files\/terraced-porous-pavement-standard-detail.dwg\">Terraced Porous Pavement Standard Detail<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/water.phila.gov\/wp-content\/uploads\/files\/trap-with-fai-standard-detail.dwg\">Trap with Fresh Air Inlet Standard Detail<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/water.phila.gov\/wp-content\/uploads\/files\/underdrain-connection-standard-detail.dwg\">Underdrain Connection Standard Detail<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/water.phila.gov\/wp-content\/uploads\/files\/underdrain-orifice-standard-detail.dwg\">Underdrain Orifice Standard Detail<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Typical construction details for several SMPs, including all of PWD\u2019s highest-preference SMPs, such as bioinfiltration\/bioretention basins, porous pavement, and green roof, and for SMP-related structures, such as cleanouts, observations wells, and outlet control structures, are available for download in AutoCAD (*.dwg) format in Appendix&nbsp;L. These Standard Details incorporate design specifications pursuant to each SMP\u2019s respective [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":53,"menu_order":12,"comment_status":"closed","ping_status":"closed","template":"page-manual.php","meta":{"custom_css":"","custom_js":"","dp_submitted":"0","dp_notify":"0","dp_created":"","version":"","effective":"","short-page-title":""},"section":[],"class_list":["post-904","page","type-page","status-publish","hentry","wpautop"],"acf":[],"parsely":{"version":"1.1.0","canonical_url":"https:\/\/phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/l-standard-details\/","smart_links":{"inbound":0,"outbound":0},"traffic_boost_suggestions_count":0,"meta":{"@context":"https:\/\/schema.org","@type":"WebPage","headline":"L. Standard Details","url":"http:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/l-standard-details\/","mainEntityOfPage":{"@type":"WebPage","@id":"http:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/l-standard-details\/"},"thumbnailUrl":"","image":{"@type":"ImageObject","url":""},"articleSection":"Uncategorized","author":[{"@type":"Person","name":"Lauren Sell"}],"creator":["Lauren Sell"],"publisher":{"@type":"Organization","name":"Development Services","logo":""},"keywords":[],"dateCreated":"2023-02-22T22:21:42Z","datePublished":"2023-02-22T22:21:42Z","dateModified":"2023-10-28T06:36:46Z"},"rendered":"<script type=\"application\/ld+json\" class=\"wp-parsely-metadata\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@type\":\"WebPage\",\"headline\":\"L. Standard Details\",\"url\":\"http:\\\/\\\/water.phila.gov\\\/development\\\/stormwater-plan-review\\\/manual\\\/appendices\\\/l-standard-details\\\/\",\"mainEntityOfPage\":{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/water.phila.gov\\\/development\\\/stormwater-plan-review\\\/manual\\\/appendices\\\/l-standard-details\\\/\"},\"thumbnailUrl\":\"\",\"image\":{\"@type\":\"ImageObject\",\"url\":\"\"},\"articleSection\":\"Uncategorized\",\"author\":[{\"@type\":\"Person\",\"name\":\"Lauren Sell\"}],\"creator\":[\"Lauren Sell\"],\"publisher\":{\"@type\":\"Organization\",\"name\":\"Development Services\",\"logo\":\"\"},\"keywords\":[],\"dateCreated\":\"2023-02-22T22:21:42Z\",\"datePublished\":\"2023-02-22T22:21:42Z\",\"dateModified\":\"2023-10-28T06:36:46Z\"}<\/script>","tracker_url":"https:\/\/cdn.parsely.com\/keys\/phila.gov\/p.js"},"_links":{"self":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages\/904","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/comments?post=904"}],"version-history":[{"count":0,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages\/904\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages\/53"}],"wp:attachment":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/media?parent=904"}],"wp:term":[{"taxonomy":"section","embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/section?post=904"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}