{"id":910,"date":"2023-02-22T17:51:00","date_gmt":"2023-02-22T22:51:00","guid":{"rendered":"http:\/\/core.loc\/development\/?page_id=252"},"modified":"2023-11-17T23:08:05","modified_gmt":"2023-11-18T04:08:05","slug":"table-e-6-standard-sequence-of-construction-notes","status":"publish","type":"page","link":"https:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/e-plan-and-report-checklists\/table-e-6-standard-sequence-of-construction-notes\/","title":{"rendered":"Table E-6: Standard Sequence of Construction Notes"},"content":{"rendered":"\n<figure class=\"wp-block-flexible-table-block-table\"><table class=\"\"><thead><tr><th>#<\/th><th>Note<\/th><\/tr><\/thead><tbody><tr><td style=\"vertical-align:top;text-align:center\">1<\/td><td>At least seven (7) days prior to any earth disturbance, the Inspections Coordinator of PWD (Office: 215-685-6387) must be called to schedule a preconstruction meeting.<\/td><\/tr><tr><td style=\"vertical-align:top;text-align:center\">2<\/td><td>At least three (3) days prior to <em>(applicant to name each SMP)<\/em> installation, the Inspections Coordinator of PWD (Office: 215-685-6387) must be called to schedule an inspection <em>(for each SMP).<\/em><\/td><\/tr><tr><td style=\"vertical-align:top;text-align:center\">3<\/td><td>All stone that makes up the <em>(applicant to name each infiltration SMP)<\/em> must remain free of sediment. If sediment enters the stone, the contractor may be required to remove the sediment and replace it with clean-washed stone.<\/td><\/tr><tr><td style=\"vertical-align:top;text-align:center\">4<\/td><td>Upon completion of all earth disturbance activities and permanent stabilization of all disturbed areas, the owner and\/or operator shall contact Inspections Coordinator of PWD (Office: 215-685-6387) for a final inspection prior to removal\/conversion of the E&amp;S BMPs.<\/td><\/tr><tr><td style=\"vertical-align:top;text-align:center\">5<\/td><td>As soon as slopes, channels, ditches, and other disturbed areas reach final grade, they must be stabilized. Cessation of activity for four (4) days or longer requires temporary stabilization.<\/td><\/tr><tr><td style=\"vertical-align:top;text-align:center\">6<\/td><td>The NPDES Notice of Termination (N.O.T.) must be submitted to PA DEP upon completion of construction <em>(when applicable)<\/em>.<\/td><\/tr><tr><td style=\"vertical-align:top;text-align:center\">7<\/td><td>Water pumped from work areas should be treated for sediment removal prior to discharging to a \u201csurface water\u201d <em>(when applicable)<\/em>.<\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":3,"featured_media":0,"parent":897,"menu_order":6,"comment_status":"closed","ping_status":"closed","template":"page-manual.php","meta":{"custom_css":"","custom_js":"","dp_submitted":"0","dp_notify":"0","dp_created":"","version":"","effective":"","short-page-title":""},"section":[],"class_list":["post-910","page","type-page","status-publish","hentry","wpautop"],"acf":[],"parsely":{"version":"1.1.0","canonical_url":"https:\/\/phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/e-plan-and-report-checklists\/table-e-6-standard-sequence-of-construction-notes\/","smart_links":{"inbound":0,"outbound":0},"traffic_boost_suggestions_count":0,"meta":{"@context":"https:\/\/schema.org","@type":"WebPage","headline":"Table E-6: Standard Sequence of Construction Notes","url":"http:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/e-plan-and-report-checklists\/table-e-6-standard-sequence-of-construction-notes\/","mainEntityOfPage":{"@type":"WebPage","@id":"http:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/e-plan-and-report-checklists\/table-e-6-standard-sequence-of-construction-notes\/"},"thumbnailUrl":"","image":{"@type":"ImageObject","url":""},"articleSection":"Uncategorized","author":[{"@type":"Person","name":"Lauren Sell"}],"creator":["Lauren Sell"],"publisher":{"@type":"Organization","name":"Development Services","logo":""},"keywords":[],"dateCreated":"2023-02-22T22:51:00Z","datePublished":"2023-02-22T22:51:00Z","dateModified":"2023-11-18T04:08:05Z"},"rendered":"<script type=\"application\/ld+json\" class=\"wp-parsely-metadata\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@type\":\"WebPage\",\"headline\":\"Table E-6: Standard Sequence of Construction Notes\",\"url\":\"http:\\\/\\\/water.phila.gov\\\/development\\\/stormwater-plan-review\\\/manual\\\/appendices\\\/e-plan-and-report-checklists\\\/table-e-6-standard-sequence-of-construction-notes\\\/\",\"mainEntityOfPage\":{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/water.phila.gov\\\/development\\\/stormwater-plan-review\\\/manual\\\/appendices\\\/e-plan-and-report-checklists\\\/table-e-6-standard-sequence-of-construction-notes\\\/\"},\"thumbnailUrl\":\"\",\"image\":{\"@type\":\"ImageObject\",\"url\":\"\"},\"articleSection\":\"Uncategorized\",\"author\":[{\"@type\":\"Person\",\"name\":\"Lauren Sell\"}],\"creator\":[\"Lauren Sell\"],\"publisher\":{\"@type\":\"Organization\",\"name\":\"Development Services\",\"logo\":\"\"},\"keywords\":[],\"dateCreated\":\"2023-02-22T22:51:00Z\",\"datePublished\":\"2023-02-22T22:51:00Z\",\"dateModified\":\"2023-11-18T04:08:05Z\"}<\/script>","tracker_url":"https:\/\/cdn.parsely.com\/keys\/phila.gov\/p.js"},"_links":{"self":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages\/910","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/comments?post=910"}],"version-history":[{"count":0,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages\/910\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages\/897"}],"wp:attachment":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/media?parent=910"}],"wp:term":[{"taxonomy":"section","embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/section?post=910"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}