{"id":911,"date":"2023-02-22T17:51:01","date_gmt":"2023-02-22T22:51:01","guid":{"rendered":"http:\/\/core.loc\/development\/?page_id=253"},"modified":"2023-11-17T23:06:23","modified_gmt":"2023-11-18T04:06:23","slug":"table-e-7-post-construction-stormwater-management-plan-report-requirements","status":"publish","type":"page","link":"https:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/e-plan-and-report-checklists\/table-e-7-post-construction-stormwater-management-plan-report-requirements\/","title":{"rendered":"Table E-7: Post-Construction Stormwater Management Plan Report Requirements"},"content":{"rendered":"\n<figure class=\"wp-block-flexible-table-block-table alignwide is-content-justification-center allow-break\"><table class=\"\"><thead><tr><th style=\"text-align:center\">PCSMP Report Section*<\/th><th style=\"text-align:center\">Requirements<\/th><\/tr><\/thead><tbody><tr><td style=\"vertical-align:top\">Cover<\/td><td style=\"vertical-align:top\"><ul><li>Signed and sealed by a Professional Engineer<\/li><\/ul><\/td><\/tr><tr><td style=\"vertical-align:top\">Introduction \/ Project&nbsp;Description<\/td><td style=\"vertical-align:top\"><ul><li>Project summary<\/li><li>Stormwater management summary<\/li><ul><li>Applicable PWD Stormwater Regulations<\/li><li>Applicable State and Federal regulatory\/permit requirements<\/li><\/ul><li>Existing site and drainage conditions summary<\/li><\/ul><\/td><\/tr><tr><td style=\"vertical-align:top\">Project Soils<\/td><td style=\"vertical-align:top\"><ul><li>Soil survey map<\/li><li>Hydrologic Soil Group discussion<\/li><\/ul><\/td><\/tr><tr><td style=\"vertical-align:top\">Stormwater Management<\/td><td style=\"vertical-align:top\"><ul><li>Stormwater management design methodology<ul><li>Rainfall depths and distribution, if applicable (Section&nbsp;3.4)<\/li><li>Runoff estimation method, if applicable (Section&nbsp;3.4)<\/li><li>Flow and storage routing methods, if applicable (Section&nbsp;3.4)<\/li><\/ul><\/li><li>Stormwater analysis summary and discussion<\/li><li>Proposed stormwater management design<ul><li>Proposed stormwater management practice (SMP) summaries, if proposed<\/li><li>Infiltration summary<\/li><li>Proposed disconnected impervious cover (DIC) summaries, if proposed<\/li><li>Proposed Stormwater Management Banking or Trading discussion, if proposed (Section&nbsp;3.2.4)<ul><li>Type of Stormwater Management Banking or Trading proposed<\/li><li>Description of area(s) proposed to be banked or traded<\/li><li>Square footage(s) of area(s) proposed to be banked or traded<\/li><li>Justification for the proposed bank or trade, including reasons why management of the required area(s) is not feasible and why PWD may benefit from the proposal<\/li><\/ul><\/li><li>Proposed fee in lieu discussion, if proposed (Section&nbsp;3.4.1)<ul><li>Square footage(s) of area(s) for proposed fee in lieu<\/li><li>All Water Quality stormwater management strategies considered and rejected<\/li><li>Justification for the proposed fee in lieu, including reasons why all considered stormwater management strategies are not feasible or advisable<\/li><\/ul><\/li><\/ul><\/li><\/ul><\/td><\/tr><tr><td style=\"vertical-align:top\">Appendices<\/td><td style=\"vertical-align:top\"><ul><li>Stormwater analysis calculations<ul><li>Static storage calculations, if applicable (Section&nbsp;3.4.1)<\/li><li>Predevelopment and post-development Tc calculations, if applicable (Section&nbsp;3.4.1)<\/li><li>Predevelopment and post-development hydrologic modeling, if applicable (Section&nbsp;3.4.1)<ul><li>Model routing<\/li><li>Input parameters<\/li><li>Hydrograph summaries<\/li><li>Pond summaries<\/li><li>Hydrologic modeling input files, if applicable<\/li><\/ul><\/li><\/ul><\/li><li>Pipe capacity calculations<\/li><\/ul><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>The following items are required, but may be included in the PCSMP Report or submitted separately as part of the PCSMP Review Phase Submission Package.<\/p>\n\n\n\n<figure class=\"wp-block-flexible-table-block-table alignwide is-content-justification-center allow-break\"><table class=\"\"><thead><tr><th style=\"text-align:center\">PCSMP Report Section*<\/th><th style=\"text-align:center\">Requirements<\/th><\/tr><\/thead><tbody><tr><td style=\"vertical-align:top\">Drainage Area Plan(s)<\/td><td style=\"vertical-align:top\"><ul><li>Predevelopment and post-development drainage areas (including any off-site area)<\/li><li>Location of point(s) of analysis (POA)<\/li><li>Pertinent existing stormwater infrastructure necessary to define existing drainage conditions<\/li><\/ul><\/td><\/tr><tr><td style=\"vertical-align:top\">Inlet Drainage<br>Area Plan<\/td><td style=\"vertical-align:top\"><ul><li>Predevelopment and post-development inlet drainage area delineations (including any roof leaders)<\/li><li>Calculated areas of drainage and time of concentration to each inlet<\/li><li>Impervious and pervious cover and runoff coefficients within each drainage area<\/li><\/ul><\/td><\/tr><tr><td style=\"vertical-align:top\"><a href=\"https:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/chapter-3\/3-4-how-to-show-compliance\/#Worksheet\">PWD Stormwater Plan Review Online Technical Worksheet<\/a><\/td><td style=\"vertical-align:top\"><ul><li>PDF printout of completed Online Technical Worksheet. For submissions via the Project Dashboard on the PWD <a href=\"https:\/\/www.pwdplanreview.org\/\">Stormwater Plan Review<\/a> website, a PDF is automatically generated and submitted.<\/li><\/ul><\/td><\/tr><tr><td class=\"keep-together print-break\" style=\"vertical-align:top\">Geotechnical Report<\/td><td class=\"keep-together\" style=\"vertical-align:top\"><ul class=\"keep-together\"><li>Signed and sealed by a Professional Engineer<\/li><li>Detailed description of testing procedure and materials\/apparatus used<\/li><li>Weather information at time of testing and previous 24 hours (temperature, rainfall, etc.)<\/li><li>Engineer\u2019s analysis and summary of all results including soil classification (in accordance with ASTM D2488) and site evaluation<\/li><li>Engineer\u2019s affirmative or negative recommendation on feasibility of infiltration, with justification<\/li><li>Infiltration Testing and Soil Characterization Plan (including, but not limited to, topographic\/existing features of the site showing location of test pits\/borings and infiltration tests)<\/li><li>Field boring\/test pit logs for soil profiling<\/li><li>Infiltration Testing Log (Appendix H provides a template, which shows minimum level of information that must be provided)<\/li><li>Sieve analysis results per ASTM D422-63, down to No. 200 sieve, and USCS classification per ASTM D2487 of each sample<\/li><li>Photographs of testing<\/li><\/ul><\/td><\/tr><tr><td style=\"vertical-align:top\"><a href=\"https:\/\/water.phila.gov\/development\/resources\/#media-filter\">Media Filter Design Documentation<\/a><\/td><td style=\"vertical-align:top\"><ul><li>Inflow and outflow event mean concentrations and percent removals for Total Suspended Solids (TSS) for sand\/media filters (Designs must demonstrate a maximum effluent event mean concentration of 15 milligrams per liter for TSS at a POA downstream of the SMP)<\/li><li>Third-party certifications for proprietary media filters<\/li><li>Hydrologic and hydraulic model files, if applicable<\/li><li>Product specifications for proprietary media filters<\/li><li>Manufacturer\u2019s guidelines for installation for proprietary media filters<\/li><li>Construction sequence<\/li><li>Maintenance requirements, including product life and replacement schedule, if applicable<\/li><\/ul><\/td><\/tr><tr><td style=\"vertical-align:top\"><a href=\"https:\/\/water.phila.gov\/development\/resources\/#low-flow\">Low Flow Device Design Documentation<\/a><\/td><td style=\"vertical-align:top\"><ul style=\"padding-top: 0px; padding-right: 0px; padding-bottom: 0px; box-sizing: inherit; color: rgb(62, 69, 77); white-space-collapse: collapse;\"><li style=\"padding: 0px; box-sizing: inherit; font-family: inherit;\">Performance\/discharge curves<\/li><li style=\"padding: 0px; box-sizing: inherit; font-family: inherit;\">Third-party certifications<\/li><li style=\"padding: 0px; box-sizing: inherit; font-family: inherit;\">Hydrologic and hydraulic model files, if applicable<\/li><li style=\"padding: 0px; box-sizing: inherit; font-family: inherit;\">Product specifications<\/li><li style=\"padding: 0px; box-sizing: inherit; font-family: inherit;\">Manufacturer\u2019s guidelines for installation<\/li><li style=\"padding: 0px; box-sizing: inherit; font-family: inherit;\">Construction sequence<\/li><li style=\"padding: 0px; box-sizing: inherit; font-family: inherit;\">Maintenance requirements, including product life and replacement schedule, if applicable<\/li><\/ul><\/td><\/tr><tr><td class=\"print-break\" style=\"vertical-align:top\"><a href=\"https:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/g-smp-maintenance-guide-documents\/\">SMP Maintenance Guide (Appendix&nbsp;G)<\/a><\/td><td style=\"vertical-align:top\"><ul><li>SMP Maintenance Guide Introduction<ul><li>Customized, from the third page of the SMP Maintenance Guide Information document provided in Appendix&nbsp;G, to be site-specific<\/li><li>Provides under its cover an SMP Maintenance Guide Site Map and SMP Maintenance Schedule Forms<\/li><\/ul><\/li><li>SMP Maintenance Guide Site Map<ul><li>Identifies the on-site SMPs and key SMP-related features which require maintenance, using unique, legible, labels, and provides a list of structures and SMP-related features, identifying the associated SMP(s) for each<\/li><li>Includes a Color Legend that adheres to the Color Legend provided in the SMP Maintenance Guide document provided in Appendix&nbsp;G<\/li><li>Sized 11\u201d x 17\u201d (Multiple sheets may be used, if necessary)<\/li><li>Consistent in format with the SMP Maintenance Guide Sample&rsquo;s Site Map, provided in Appendix&nbsp;G<\/li><\/ul><\/li><li>SMP Maintenance Schedule Forms<ul><li>Customized from the templates provided in Appendix&nbsp;G to be site-specific for each proposed SMP<\/li><li>Provide for inspection of each SMP and SMP-related structure, including routine maintenance, repair, and replacement<\/li><li>Provide for a report documenting each inspection and all SMP maintenance activities performed as a result of the inspections<\/li><\/ul><\/li><\/ul><\/td><\/tr><tr><td style=\"vertical-align:top\"><a href=\"https:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/j-construction-certification-package\/\">Construction Certification Package with Customized SMP Construction Certification Forms (Appendix&nbsp;J)<\/a><\/td><td style=\"vertical-align:top\"><ul><li>One site-specific SMP Construction Certification Form for each SMP<\/li><\/ul><\/td><\/tr><tr><td class=\"print-break\" style=\"vertical-align:top\">Proof of Applicable State and\/or Federal Permits<\/td><td style=\"vertical-align:top\"><ul><li>Typical permits (as applicable):<ul><li>Pennsylvania Code and Charter Chapter&nbsp;102 NPDES National Pollutant Discharge Elimination System Phase II Permit for Construction Activities<\/li><li>Pennsylvania Code and Charter Chapter&nbsp;105: Water Obstruction and Encroachment General and Joint Permits<\/li><li>Other applicable permits (Sections 2.5, 2.6, and 2.7 provide resources to assist in determining which permits may apply)<\/li><\/ul><\/li><li>Proof of issuance is required for PWD sign-off on a Building Permit; however, the applicant must only prove that they have applied for all applicable permits via copies of permit applications, application receipts, or notification letters from relevant agencies<\/li><li>For Pennsylvania Land Recycling Program (Act 2) sites, proof of notice to PA DEP for both an intent to remediate and notification of work to an existing Act 2 site is required<\/li><\/ul><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><em>*The PCSMP Report section divisions\/organization listed are not required, but are provided by PWD to aid the applicant in organizing the required inclusions in the PCSMP Report.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The following items are required, but may be included in the PCSMP Report or submitted separately as part of the PCSMP Review Phase Submission Package. *The PCSMP Report section divisions\/organization listed are not required, but are provided by PWD to aid the applicant in organizing the required inclusions in the PCSMP Report.<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":897,"menu_order":7,"comment_status":"closed","ping_status":"closed","template":"page-manual.php","meta":{"custom_css":"","custom_js":"","dp_submitted":"0","dp_notify":"0","dp_created":"","version":"","effective":"","short-page-title":"Table E-7: PCSMP Report Requirements"},"section":[],"class_list":["post-911","page","type-page","status-publish","hentry","wpautop"],"acf":[],"parsely":{"version":"1.1.0","canonical_url":"https:\/\/phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/e-plan-and-report-checklists\/table-e-7-post-construction-stormwater-management-plan-report-requirements\/","smart_links":{"inbound":0,"outbound":0},"traffic_boost_suggestions_count":0,"meta":{"@context":"https:\/\/schema.org","@type":"WebPage","headline":"Table E-7: Post-Construction Stormwater Management Plan Report Requirements","url":"http:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/e-plan-and-report-checklists\/table-e-7-post-construction-stormwater-management-plan-report-requirements\/","mainEntityOfPage":{"@type":"WebPage","@id":"http:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/e-plan-and-report-checklists\/table-e-7-post-construction-stormwater-management-plan-report-requirements\/"},"thumbnailUrl":"","image":{"@type":"ImageObject","url":""},"articleSection":"Uncategorized","author":[{"@type":"Person","name":"Lauren Sell"}],"creator":["Lauren Sell"],"publisher":{"@type":"Organization","name":"Development Services","logo":""},"keywords":[],"dateCreated":"2023-02-22T22:51:01Z","datePublished":"2023-02-22T22:51:01Z","dateModified":"2023-11-18T04:06:23Z"},"rendered":"<script type=\"application\/ld+json\" class=\"wp-parsely-metadata\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@type\":\"WebPage\",\"headline\":\"Table E-7: Post-Construction Stormwater Management Plan Report Requirements\",\"url\":\"http:\\\/\\\/water.phila.gov\\\/development\\\/stormwater-plan-review\\\/manual\\\/appendices\\\/e-plan-and-report-checklists\\\/table-e-7-post-construction-stormwater-management-plan-report-requirements\\\/\",\"mainEntityOfPage\":{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/water.phila.gov\\\/development\\\/stormwater-plan-review\\\/manual\\\/appendices\\\/e-plan-and-report-checklists\\\/table-e-7-post-construction-stormwater-management-plan-report-requirements\\\/\"},\"thumbnailUrl\":\"\",\"image\":{\"@type\":\"ImageObject\",\"url\":\"\"},\"articleSection\":\"Uncategorized\",\"author\":[{\"@type\":\"Person\",\"name\":\"Lauren Sell\"}],\"creator\":[\"Lauren Sell\"],\"publisher\":{\"@type\":\"Organization\",\"name\":\"Development Services\",\"logo\":\"\"},\"keywords\":[],\"dateCreated\":\"2023-02-22T22:51:01Z\",\"datePublished\":\"2023-02-22T22:51:01Z\",\"dateModified\":\"2023-11-18T04:06:23Z\"}<\/script>","tracker_url":"https:\/\/cdn.parsely.com\/keys\/phila.gov\/p.js"},"_links":{"self":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages\/911","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/comments?post=911"}],"version-history":[{"count":0,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages\/911\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages\/897"}],"wp:attachment":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/media?parent=911"}],"wp:term":[{"taxonomy":"section","embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/section?post=911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}