{"id":912,"date":"2023-02-22T17:51:02","date_gmt":"2023-02-22T22:51:02","guid":{"rendered":"http:\/\/core.loc\/development\/?page_id=254"},"modified":"2023-11-17T22:57:03","modified_gmt":"2023-11-18T03:57:03","slug":"table-e-8-record-drawing-requirements","status":"publish","type":"page","link":"https:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/e-plan-and-report-checklists\/table-e-8-record-drawing-requirements\/","title":{"rendered":"Table E-8: Record Drawing Requirements"},"content":{"rendered":"\n<figure class=\"wp-block-flexible-table-block-table allow-break\"><table class=\"\"><thead><tr><th>#<\/th><th>Requirement<\/th><\/tr><\/thead><tbody><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">1<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">General plan presentation requirements listed in Table&nbsp;E\u20111 (The preparer of the Record Drawing(s) must prominently display their signature and professional seal, or, in the case of Licensed Contractors, their signature, printed name, business title, company name, and City of Philadelphia Department of Licenses and Inspections Contractor License Number, all of which must be clearly labeled, on each Record Drawing plan sheet.)<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">2<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Labeling on each document as \u201cProject Record\u201d with large, red letters<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">3<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Record Drawing drafting date on each sheet<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">4<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Drawing scale of 1\u201d=50\u2019 or less<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">5<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Information confirmed to be in accordance with the Approved Post\u2011Construction Stormwater Management Plan (PCSMP) highlighted in yellow<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">6<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Information that deviates from the Approved PCSMP highlighted in red<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">7<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Benchmark elevation, description, and location on each plan sheet<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">8<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Horizontal variations greater than one foot shown dimensionally or through stations<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">9<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Vertical elevation variations greater than 0.1 feet shown for all design elevations shown<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">10<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Locations of all proposed stormwater management practices (SMPs) in plan view<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">11<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Distance from lot lines to the constructed SMPs<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">12<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Locations of utilities<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">13<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Spot grade elevations and\/or contour lines at one-foot intervals<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">14<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Stormwater flow direction arrows<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">15<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Elevations across dam embankments<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">16<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Elevations at the top of risers<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">17<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Elevations at the invert and rim of all orifice openings in risers and control structures<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">18<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Elevations across emergency spillways<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">19<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Elevations across the bottom of ponds (excluding wet ponds)<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">20<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Elevations for of all inlet and outlet controls<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">21<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Elevations at inverts of all pipes, swales, and drains<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">22<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Measurements and invert elevations for all orifices, weirs, and other flow control devices<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">23<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Pipe and culvert material, length, size, and slope, inlet and outlet locations, and rim and invert elevations<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">24<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Information for any energy dissipation measures<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">25<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Drainage areas for each SMP, if they differ from the Approved PCSMP<\/td><\/tr><tr><td style=\"text-align:center;padding:0.2em 0.5em;vertical-align:top\">26<\/td><td style=\"padding:0.2em 0.5em;vertical-align:top\">Detail or cross-section of each SMP with all pertinent elevations labeled<\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":3,"featured_media":0,"parent":897,"menu_order":8,"comment_status":"closed","ping_status":"closed","template":"page-manual.php","meta":{"custom_css":"","custom_js":"","dp_submitted":"0","dp_notify":"0","dp_created":"","version":"","effective":"","short-page-title":"","pwd_rlv_phrase_match":"table e 8 record drawing requirements | table e 8 record drawing requirements | requirement 1 general plan presentation requirements listed in table e 1 the preparer of the record drawing s must prominently display their signature and professional seal or in the case of licensed contractors their signature printed name business title company name and city of philadelphia department of licenses and inspections contractor license number all of which must be clearly labeled on each record drawing plan sheet 2 labeling on each document as project record with large red letters 3 record drawing drafting date on each sheet 4 drawing scale of 1 50 or less 5 information confirmed to be in accordance with the approved post construction stormwater management plan pcsmp highlighted in yellow 6 information that deviates from the approved pcsmp highlighted in red 7 benchmark elevation description and location on each plan sheet 8 horizontal variations greater than one foot shown dimensionally or through stations 9 vertical elevation variations greater than 0 1 feet shown for all design elevations shown 10 locations of all proposed stormwater management practices smps in plan view 11 distance from lot lines to the constructed smps 12 locations of utilities 13 spot grade elevations and or contour lines at one foot intervals 14 stormwater flow direction arrows 15 elevations across dam embankments 16 elevations at the top of risers 17 elevations at the invert and rim of all orifice openings in risers and control structures 18 elevations across emergency spillways 19 elevations across the bottom of ponds excluding wet ponds 20 elevations for of all inlet and outlet controls 21 elevations at inverts of all pipes swales and drains 22 measurements and invert elevations for all orifices weirs and other flow control devices 23 pipe and culvert material length size and slope inlet and outlet locations and rim and invert elevations 24 information for any energy dissipation measures 25 drainage areas for each smp if they differ from the approved pcsmp 26 detail or cross section of each smp with all pertinent elevations labeled","pwd_rlv_wordcount":"299"},"section":[],"class_list":["post-912","page","type-page","status-publish","hentry","wpautop"],"acf":[],"parsely":{"version":"1.1.0","canonical_url":"https:\/\/phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/e-plan-and-report-checklists\/table-e-8-record-drawing-requirements\/","smart_links":{"inbound":0,"outbound":0},"traffic_boost_suggestions_count":0,"meta":{"@context":"https:\/\/schema.org","@type":"WebPage","headline":"Table E-8: Record Drawing Requirements","url":"http:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/e-plan-and-report-checklists\/table-e-8-record-drawing-requirements\/","mainEntityOfPage":{"@type":"WebPage","@id":"http:\/\/water.phila.gov\/development\/stormwater-plan-review\/manual\/appendices\/e-plan-and-report-checklists\/table-e-8-record-drawing-requirements\/"},"thumbnailUrl":"","image":{"@type":"ImageObject","url":""},"articleSection":"Uncategorized","author":[{"@type":"Person","name":"Lauren Sell"}],"creator":["Lauren Sell"],"publisher":{"@type":"Organization","name":"Development Services","logo":""},"keywords":[],"dateCreated":"2023-02-22T22:51:02Z","datePublished":"2023-02-22T22:51:02Z","dateModified":"2023-11-18T03:57:03Z"},"rendered":"<script type=\"application\/ld+json\" class=\"wp-parsely-metadata\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@type\":\"WebPage\",\"headline\":\"Table E-8: Record Drawing Requirements\",\"url\":\"http:\\\/\\\/water.phila.gov\\\/development\\\/stormwater-plan-review\\\/manual\\\/appendices\\\/e-plan-and-report-checklists\\\/table-e-8-record-drawing-requirements\\\/\",\"mainEntityOfPage\":{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/water.phila.gov\\\/development\\\/stormwater-plan-review\\\/manual\\\/appendices\\\/e-plan-and-report-checklists\\\/table-e-8-record-drawing-requirements\\\/\"},\"thumbnailUrl\":\"\",\"image\":{\"@type\":\"ImageObject\",\"url\":\"\"},\"articleSection\":\"Uncategorized\",\"author\":[{\"@type\":\"Person\",\"name\":\"Lauren Sell\"}],\"creator\":[\"Lauren Sell\"],\"publisher\":{\"@type\":\"Organization\",\"name\":\"Development Services\",\"logo\":\"\"},\"keywords\":[],\"dateCreated\":\"2023-02-22T22:51:02Z\",\"datePublished\":\"2023-02-22T22:51:02Z\",\"dateModified\":\"2023-11-18T03:57:03Z\"}<\/script>","tracker_url":"https:\/\/cdn.parsely.com\/keys\/phila.gov\/p.js"},"_links":{"self":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages\/912","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/comments?post=912"}],"version-history":[{"count":0,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages\/912\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/pages\/897"}],"wp:attachment":[{"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/media?parent=912"}],"wp:term":[{"taxonomy":"section","embeddable":true,"href":"https:\/\/water.phila.gov\/development\/wp-json\/wp\/v2\/section?post=912"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}