@Philly H2O Blog

All posts tagged: Green Infrastructure


This Place Is BMPing: Saylor Grove

January 6, 2012  |  Matt Fritch, Environmental Engineer

Before the Philadelphia Water Department constructed a stormwater wetland at Saylor Grove in Fairmount Park, the area received an excessive amount of runoff that drained into Monoshone Creek, a tributary to the Wissahickon, resulting in erosion of the Monoshone and impaired water quality.

Read More →


This Saturday: Green Roofs 101

January 4, 2012  |  Matthew Fritch

Want to know the basics behind green roofs? Join master gardener Stephanie Alarcon on Saturday, January 14 from 9:00 a.m. to 11:00 a.m. at the Horticultural Center in Fairmount Park for a discussion on the fundamental issues in green roof planning.

Read More →


11 For 2011: PWD’s Solar Array

December 29, 2011  |  Matthew Fritch

In April, the City of Philadelphia unveiled its first solar photovoltaic system (above), located at PWD’s Southeast Water Pollution Control Plant.

Read More →


11 For 2011: The Media Sends the Message

December 28, 2011  |  Matthew Fritch

When it comes to spreading the word about Green City, Clean Waters—Philadelphia’s 25-year plan to protect and enhance our watersheds largely through green infrastructure—PWD had a lot of help in 2011.

Read More →


11 For 2011: Percy Street Porous Paving

December 27, 2011  |  Matthew Fritch

In June, the city’s first porous street debuted in South Philadelphia. The 800 block of Percy Street is just six feet wide, but the replacement of traditional impervious asphalt with a porous surface has already had a big impact:

Read More →


11 For 2011: Hunting Park Tree Trenches and Planters

December 26, 2011  |  Public Affairs

PWD’s Watersheds blog closes out the year with a list of 11 green missions accomplished in 2011, from innovative stormwater management projects and stream restorations to groundbreaking policy agreements and energy-generating solar arrays.

Read More →


11 For 2011: Green Roof Bus Shelter

December 25, 2011  |  Public Affairs

Merry Christmas—and remember that good things come in small packages. Such is the case for PWD’s green roof bus shelter demonstration project at 15th and Market streets.

Read More →


11 For 2011: Queen Lane Bumpouts

December 23, 2011  |  Matthew Fritch

Philadelphia’s first stormwater bumpouts debuted this summer on Queen Lane in East Falls. Stormwater bumpouts are just one of PWD’s green stormwater infrastructure tools to reduce runoff and prevent combined sewer overflows into our rivers and streams.

Read More →


11 For 2011: Venice Island Groundbreaking

December 22, 2011  |  Matthew Fritch

On Nov. 1, city officials broke ground on Venice Island in Manayunk, the site of a $46 million project whose main component is a large underground storage basin that will prevent stormwater runoff from entering the Schuylkill River.

Read More →