East Mount Airy, Northwest Philadelphia
Forrest / Wadsworth
Overview
Project #20583 Forrest / Wadsworth will replace water mains and install green stormwater infrastructure in the Cedarbrook neighborhood.
The map above shows where new water mains will be installed and the service lines connected to the new mains. These properties may experience limited water interruptions during construction.
An assigned PWD inspector and engineer will be on-site and can answer questions about the work. Inspector and engineer contact information are listed below.
For more information, please email the PWD community outreach team at water.projects@phila.gov. Please specify the project name, project number, and ZIP code in your email.
Streets Affected
| Street | Segment | Type of Work |
|---|---|---|
| Wadsworth Ave. | from Thouron Ave. to Forrest Ave. | New Water Main |
| Wadsworth Ave. | from Forrest Ave. to Williams Ave. | GSI Subsurface Trench |
| Forrest Ave. | from E. Gowen Ave. to E. Sedgwick St. | New Water Main |
| Forrest Ave. | from E. Mt. Airy Ave. to E. Mt. Pleasant St. | GSI Subsurface Trench |
| Thouron Ave. | from E. Gowen Ave. to Wadsworth Ave. | New Water Main, GSI Subsurface Trench |
| Williams Ave. | from Roumfort Rd. to Wadsworth Ave. | New Water Main |
| Gilbert St. | from E. Mt. Airy Ave. to Easton Rd. | New Water Main |
| Rugby St. | from E. Mt. Airy Ave. to Easton Rd. | New Water Main |
| E. Sedgwick St. | from Thouron Ave. to Williams Ave. | New Water Main, GSI Subsurface Trenches |
For worksite issues, contact:
- Matt Yoslov
Inspector (on-site)
856-684-0035 - John Cahill
Project Engineer
John.E.Cahill@phila.gov
215-520-7885 - Shyam Thomas
Division Engineer
Shyam.Thomas@phila.gov
215-685-6359 - Seravalli Construction Inc.
Contractor
john.seravalli@seravalli.com
-
For more information, contact:
- PWD Community Outreach Team
water.projects@phila.gov