Nicholas / Judson

Current Phase:

Start:

Spring 2025

Overview

Project #41070 Nicholas / Judson will replace water and sewer mains and install green stormwater infrastructure in the Brewerytown neighborhood. Work is estimated to start in 2025.

The map above shows where new water mains will be installed and the service lines connected to the new mains. These properties may experience limited water interruptions during construction.

An assigned PWD inspector and engineer will be on-site and can answer questions about the work. Inspector and engineer contact information will be listed below when construction is nearing.

Streets Affected

  • Cecil B. Moore Ave. from N. 24th St. to N. 26th St.
  • Turner St. from N. 23rd St. to N. 24th St.
  • Nicholas St. from N. 23rd St. to N. 25th St.
  • Nicholas St. from N. 25th St. to N. 26th St. (Sewer Lining Work)
  • N. 24th St. from W. Oxford St. to Cecil B. Moore Ave.
  • Judson St. from Ridge Ave. to Montgomery Ave.
For worksite issues, contact:
For more information, contact:

Project #41070

ZIP Code
Council District

Project Files

#41070 Construction LetterSeptember 23, 2025
Jump to Top