Callowhill / N 61st
Overview
Project #41105 Callowhill / 61st will replace water and sewer mains in Haddington. Green stormwater infrastructure will also be built in the neighborhood. Work is estimated to start in 2025.
The map above shows where new water mains will be installed and the service lines connected to the new mains. These properties may experience limited water interruptions during construction.
An assigned PWD inspector and engineer will be on-site and can answer questions about the work. Inspector and engineer contact information is listed below.
Streets Affected
| Street | Segment | Type of Work |
|---|---|---|
| Callowhill St. | from N. 60th St. to N. 62nd St.: New water main and sewer | |
| N. 61st St. | from W. Girard Ave. to Vine St.: New water main and sewer | |
| N. 61st St. | from Vine St. to Race St.: New water main, sewer, GSI | |
| N. Edgewood St. | from W. Girard Ave. to Callowhill St.: New water main and sewer |
For worksite issues, contact:
- Nasir Halayqeh
Inspector (on-site)
nasir.halayqeh@phila.gov - Romeo Gjergji
Project Engineer
Romeo.Gjergji@Phila.gov
215-200-4413 - Nasser Albarouki
Division Engineer
Nasser.Albarouki@phila.gov
215-380-3881
For more information, contact:
- Amy Hopf
PWD Construction Liaison
water.construction@phila.gov - Olivia Boon
D1 Community Outreach Specialist
olivia.boon@phila.gov