Passyunk Square, South Philadelphia
1600 Block of S 12th
Overview
Project #41261 is an emergency water main and sewer replacement project. The work will replace the infrastructure along S. 12th St. in the Passyunk Square neighborhood.
The Water Department has assigned an engineer and inspector to the project who will be on-site every day. For on-site problems or questions about the work, please talk with the inspector or engineer on the job site.
At times, you may experience short, temporary service interruptions. PWD will alert you one business day before planned, longer-period service interruptions.
Streets Affected
- S. 12th St. from Tasker St. to E. Passyunk Ave.
- Morris St. from S. 12th St. to E. Passyunk Ave.
- E. Passyunk Ave. from S. 12th St. to Morris St.
For worksite issues, contact:
- Nasir Harris
Inspector (on-site)
nharrissalahuddin@kseng.com - John Cahill
Project Engineer
John.E.Cahill@phila.gov
215-520-7885 - Shyam Thomas
Division Engineer
Shyam.Thomas@phila.gov
215-685-6359
For more information, contact:
- Amy Hopf
PWD Construction Liaison
water.construction@phila.gov