Project #20484 Springfield / Wilton will replace water mains in the Kingsessing neighborhood.

Streets Affected

  • S. 56th St. from Springfield Ave. to Chester Ave.
  • Springfield Ave. from S. 54th St. to S. 56th St.
  • S. Allison St. from Springfield Ave. to Chester Ave.
  • S. Vogdes St. from Springfield Ave. to Chester Ave.
  • S. Ruby St. from Springfield Ave. to Chester Ave.
  • S. Wilton St. from Springfield Ave. to Kingsessing Ave.
  • Upland St. from S. 52nd St. to S. 54th St.
  • S. Paxon St. from Kingsessing Ave. to Greenway Ave.
For worksite issues, contact:
For more information, contact:

Project #20484

Project Type
ZIP Code
Council District

Project Files

20484 Construction LetterDecember 15, 2022

Updates

Unexpected water shut-off

December 2022: Neighbors along 5500 block of Windsor  reported unexpected water shut-offs.

Contractors were installing new pipe at 55th / Springfield and closed the valve on 55th / Windsor. 5500 block of Windsor was supposed to get water from the valve on the other end of the block, but the valve on 54th St was closed as well, unauthorized.

Once the construction team was notified, valve was re-opened and residents were checked on. Issue resolved.

Posted by:
Amy Hopf
Category:
Project Update

Construction started

Construction began for project #20484.