Carlisle / Federal

Current Phase:

Start:

Estimated Fall 2024

Overview

Project #40857 Carlisle / Federal will replace water and sewer mains in the Newbold/Point Breeze neighborhood of South Philadelphia.

The Water Department will have an assigned engineer and inspector for the project, who will be on-site every day. For on-site problems/questions, please talk with the inspector or engineer on the job site. Contact information will be listed below when construction is nearing.

Water shut-offs are required for this work and typically start at 9am, lasting 2 to 8 hours.

For worksite issues, contact:
For more information, contact:

Project #40857

Project Type
ZIP Code