Herbert / Overington

Current Phase:

Estimated Start:

April 2026

Estimated Completion:

January 2027

Overview

Project #50321 Herbert / Overington is a planned PWD project in the Northwood neighborhood. It will build green stormwater infrastructure, and install new water mains in the neighborhood.

This is a Green City, Clean Waters project. These projects reduce pollution from stormwater and combined sewer overflows in Philadelphia.

Construction contact information, expected work dates, and streets affected will be listed here when construction is nearing.

During construction, an assigned PWD inspector and engineer will be on-site and can answer questions about the work.

For more information, please email the PWD community outreach team at water.projects@phila.gov. Please specify the project name, project number, and ZIP code in your email.

Streets Affected

Street Segment Type of Work
Rutland St from Large St to Naples StNew Water Main
Large St from Arrott St to Foulkrod StNew Water Main
Overington St from Rutland St to Horrocks StNew Water Main, GSI Subsurface Trench
Leiper St from Orthodox St to Overington StGSI Subsurface Trench
Large St from Orthodox St to Herbert StTree Trenches
Horrocks St from Overington St to Foulkrod StTree Trenches
For worksite issues, contact:
For more information, contact:

Project #50321

ZIP Code
Council District

Project Files

Project #50321 Construction LetterApril 30, 2026 Project #50321 Bid LetterFebruary 18, 2026
Jump to Top