Frankford, Northeast Philadelphia
Herbert / Overington
Overview
Project #50321 Herbert / Overington is a planned PWD project in the Northwood neighborhood. It will build green stormwater infrastructure, and install new water mains in the neighborhood.
This is a Green City, Clean Waters project. These projects reduce pollution from stormwater and combined sewer overflows in Philadelphia.
Construction contact information, expected work dates, and streets affected will be listed here when construction is nearing.
During construction, an assigned PWD inspector and engineer will be on-site and can answer questions about the work.
For more information, please email the PWD community outreach team at water.projects@phila.gov. Please specify the project name, project number, and ZIP code in your email.
Streets Affected
| Street | Segment | Type of Work |
|---|---|---|
| Rutland St | from Large St to Naples St | New Water Main |
| Large St | from Arrott St to Foulkrod St | New Water Main |
| Overington St | from Rutland St to Horrocks St | New Water Main, GSI Subsurface Trench |
| Leiper St | from Orthodox St to Overington St | GSI Subsurface Trench |
| Large St | from Orthodox St to Herbert St | Tree Trenches |
| Horrocks St | from Overington St to Foulkrod St | Tree Trenches |
For worksite issues, contact:
- Gene Palmieri
Inspector (on-site)
gpalmieri@cedarvilleeng.com
484-571-9955 - Tyler Krechmer
Project Engineer
TKrechmer@jmt.com
267-630-4971 - Khadija Tadimi
Division Engineer
Khadija.Tadimi@phila.gov
267-234-1941
For more information, contact:
- Amy Hopf
PWD Construction Liaison
water.construction@phila.gov - PWD Community Outreach Team
water.projects@phila.gov