Mayfair, Northeast Philadelphia
Elbridge / Gilham
Start:
Estimated Winter 2022
Completion:
Estimated Spring 2023
Overview
Project #20486 Elbridge / Gilham will replace water mains in the lower Mayfair neighborhood in Northeast Philadelphia.
Work on Revere St. from Harbison Ave. to Magee Ave. will include the construction of green stormwater infrastructure tools.
Streets Affected
- Uhruh Ave. from Roosevelt Blvd. to Brous Ave.
- Fanshawe St. from Revere St. to Brous Ave.
- Gilham St. from Revere St. to Frankford Ave.
- Hellerman St. from Harbison Ave. to Brous Ave.
- Hawthorne St. from Hellerman St. to Magee Ave.
- Sackett St. from Hellerman St. to Magee Ave.
- Passmore St. from Brous Ave. to Battersby Ave.
- Elbridge St. from Brous Ave. to Battersby Ave.
- Levick St. from Hawthorne St. to Sackett St.
- Revere St. from Harbison Ave. to Magee Ave. (Both water main and GSI work)
For worksite issues, contact:
- Josh Albano
Inspector (on-site)
Josh.Albano@Phila.gov
215-685-0908 - Bobby Mathew
Project Engineer
Bobby.Mathew@phila.gov
215-686-5511 - Dave Pandya
Division Engineer
Dave.Pandya@phila.gov
215-685-6352