Feltonville, North Philadelphia
Wyoming / Whitaker
Current Phase: Pre-Construction
Overview
Project #20536 Wyoming / Whitaker will replace water mains and install green stormwater infrastructure in the Feltonville neighborhood. Work is estimated to start in 2025.
The map above shows where new water mains will be installed and the service lines connected to the new mains. These properties may experience limited water interruptions during construction.
An assigned PWD inspector and engineer will be on-site and can answer questions about the work. Inspector and engineer contact information will be listed below when construction is nearing.
For worksite issues, contact:
- Dave Pandya
Division Engineer
Dave.Pandya@phila.gov
215-685-6352
For more information, contact:
- Amy Hopf
PWD Construction Liaison
water.construction@phila.gov