Forrest / Wadsworth

Skip to Updates ↓

Current Phase:

Start:

November 3, 2025

Completion:

Estimated 2026

Overview

Project #20583 Forrest / Wadsworth will replace water mains and install green stormwater infrastructure in the Cedarbrook neighborhood.

The map above shows where new water mains will be installed and the service lines connected to the new mains. These properties may experience limited water interruptions during construction.

An assigned PWD inspector and engineer will be on-site and can answer questions about the work. Inspector and engineer contact information are listed below.

Streets Affected

  • Wadsworth Ave. from Thouron Ave. to Forrest Ave.
  • Thouron Ave. from E. Gowen Ave. to Wadsworth Ave.
  • Forrest Ave. from E. Gowen Ave. to E. Sedgwick St.
  • Williams Ave. from Roumfort Rd. to Wadsworth Ave.
  • Gilbert St. from E. Mt. Airy Ave. to Wadsworth Ave./Easton Rd.
  • Rugby St. from E. Mt. Airy Ave. to Wadsworth Ave./Easton Rd.
  • Forrest Ave. from E. Mt. Airy Ave. to E. Mt. Pleasant St. (GSI Only)
  • E. Sedgwick St. from Thouron Ave. to Williams Ave.
For worksite issues, contact:
For more information, contact:

Project #20583

Green Tools
ZIP Code

Project Files

Project #20583 Pre-Construction LetterDecember 27, 2024

Updates

Construction Starting for Project #20583

Selected contractor Seravalli Construction will be starting construction on Monday, November 3, 2025 . Start location is the 8300 block of Gilbert St.