Iseminger / Camac

Current Phase:

Start:

July 2024

Completion:

Estimated January 2025

Overview

Project #20599 Iseminger / Camac will replace water mains and install green stormwater infrastructure in the Lower Moyamensing neighborhood of South Philadelphia.

The Water Department has assigned an engineer and inspector to the project who will be on-site every day. For on-site problems or questions about the work, please talk with the inspector or engineer on the job site. Contact information is listed below.

Customers may experience limited water interruptions during construction.

Streets Affected

  • S. 12th St. from Porter St. to Wolf St.
  • Camac St. from Oregon Ave. to Shunk St.
  • Iseminger St. from Oregon Ave. to Shunk St.
  • Moyamensing Ave. from S. Broad St. to Porter St.
  • Shunk St. from S. 12th St. to S. Broad St. (Water Main Relay & Stormwater Mgmt.)
For worksite issues, contact:
For more information, contact:

Project #20599

Project Type
ZIP Code
Council District

Project Files

20599 Construction LetterApril 26, 2024