Diamond / Page / 29th

Current Phase:

Start:

June 12, 2024

Completion:

Estimated January 2025

Overview

Project #20601 Diamond / Page / 29th will replace water mains in the Strawberry Mansion neighborhood in North Philadelphia.

This project will also implement green stormwater infrastructure (GSI) along N. 29th St.

__________________________________________________________

The Water Department has assigned an engineer and inspector to the project who will be on-site every day. For on-site problems or questions about the work, please talk with the inspector or engineer on the job site. Contact information is listed below.

Water shut-offs are required for this work and typically start at 9am, lasting 2 to 8 hours.

Streets Affected

  • W. Sedgley Ave. from N. 29th St. to Ridge Ave.
  • N. 29th St. from W. Norris St. to Ridge Ave.
  • W. Page St. from N. 30th St. to N. 29th St.
  • Diamond St. from N. 28th St. to Etting St.
  • N. 28th St. from Diamond St. to W. Susquehanna Ave.
  • W. Susquehanna Ave. from W. Marston St. to N. 27th St.
  • N. 28th St. from W. Fletcher St. to Dauphin St.
  • N. 29th St. from Glenwood Ave. to W. Sedgley Ave. (GSI Work)
For worksite issues, contact:
For more information, contact:

Project #20601

Project Type
ZIP Codes
Council District

Project Files

20601 General Construction LetterMay 8, 2024