Current Phase:

Start:

June 12, 2024

Completion:

Estimated January 2025

Overview

Project #20601 Diamond / Page / 29th will replace water mains in the Strawberry Mansion neighborhood in North Philadelphia.

This project will also implement green stormwater infrastructure (GSI) along N. 29th St.

__________________________________________________________

The Water Department has assigned an engineer and inspector to the project who will be on-site every day. For on-site problems or questions about the work, please talk with the inspector or engineer on the job site. Contact information is listed below.

Water shut-offs are required for this work and typically start at 9am, lasting 2 to 8 hours.

Streets Affected

Street Segment Type of Work
W. Sedgley Ave. from N. 29th St. to Ridge Ave.
N. 29th St. from W. Norris St. to Ridge Ave.
W. Page St. from N. 30th St. to N. 29th St.
Diamond St. from N. 28th St. to Etting St.
N. 28th St. from Diamond St. to W. Susquehanna Ave.
W. Susquehanna Ave. from W. Marston St. to N. 27th St.
N. 28th St. from W. Fletcher St. to Dauphin St.
N. 29th St. from Glenwood Ave. to W. Sedgley Ave. (GSI Work)