Cambria / Glenwood
Overview
Project #20602 Cambria / Glenwood will replace water mains infrastructure in the Glenwood neighborhood.
The map above shows where new water mains will be installed and the service lines connected to the new mains. These properties may experience limited water interruptions during construction.
An assigned PWD inspector and engineer will be on-site and can answer questions about the work.
Streets Affected
- W. Cambria St. from N. 6th St. to Germantown Ave.
- N. Darien St. from W. Clearfield St. to W. Allegheny Ave.
- W. Glenwood Ave. from N. Broad St. to N. Marvine St.
For worksite issues, contact:
- Nasir Harris
Inspector (on-site)
nharrissalahuddin@kseng.com - John Cahill
Project Engineer
John.E.Cahill@phila.gov
215-520-7885 - Shyam Thomas
Division Engineer
Shyam.Thomas@phila.gov
215-685-6359
For more information, contact:
- Amy Hopf
PWD Construction Liaison
water.construction@phila.gov