Cottman / Sandyford

Current Phase:

Start:

Estimated Spring 2025

Overview

Project #20619 Cottman / Sandyford will replace water mains and install green stormwater infrastructure in the Mayfair neighborhood. Work is estimated to start in 2025.

The map above shows where new water mains will be installed and the service lines connected to the new mains. These properties may experience limited water interruptions during construction.

An assigned PWD inspector and engineer will be on-site and can answer questions about the work. Inspector and engineer contact information will be listed below when construction is nearing.

Streets Affected

  • Ryan Ave. from Nesper St. to Sandyford Ave.
  • Nesper St. from Hawthorne St. to Sackett St.
  • Vista St. from Battersby St. to Ryan Ave.
  • Battersby St. from Nesper St. to Ryan Ave.
  • Sandyford Ave. from Roosevelt Blvd. to Ryan Ave.
  • Roosevelt Blvd. from Cottman Ave. to Sandyford Ave.
  • Cottman Ave. from Roosevelt Blvd. to Brous Ave.
  • Teesdale St. from Brous Ave. to Battersby St.
  • Ryan Ave. from Nesper St. to Rowland Ave. (Water Main Reconstruction & Green Infrastructure)
For worksite issues, contact:
For more information, contact:

Project #20619

Project Type
ZIP Codes

Project Files

#20619 Construction LetterMarch 25, 2025
Jump to Top