Mercer / Birch

Current Phase:

Start:

July 2024

Completion:

Estimated July 2026

Overview

Project #40919 Mercer / Birch will replace water mains and sewer pipes in Port Richmond.

The Water Department has assigned an engineer and inspector to the project who will be on-site every day. For on-site problems or questions about the work, please talk with the inspector or engineer on the job site. Contact information is listed below.

Water shut-offs are required for this work and typically start at 9am, lasting 2 to 8 hours.

Streets Affected

  • Mercer St. from E. Ann St. to E. Indiana Ave.
  • E. Birch St. from Almond St. to Edgemont St.
  • Chatham St. from E. Somerset St. to E. Cambria St.
  • Almond St. from E. Allegheny Ave. to E. Westmoreland St.
  • Almond St. from E. Albert St. to E. Huntingdon St.
  • E. Somerset St. from Amber St. to Trenton Ave. (Sewer Reconstruction only)
For worksite issues, contact:
For more information, contact:

Project #40919

Project Type
ZIP Code
Council District

Project Files

40919 General Construction LetterJune 20, 2024
Jump to Top