,

Bambrey / Stillman

Current Phase:

Overview

Project #40925 Bambrey / Stillman will replace water and sewer mains infrastructure in the Allegheny West neighborhood in North Philadelphia. Work is estimated to start in 2025.

The map above shows where new water mains will be installed and the service lines connected to the new mains. These properties may experience limited water interruptions during construction.

An assigned PWD inspector and engineer will be on-site and can answer questions about the work. Inspector and engineer contact information will be listed below when construction is nearing.

Project #40925

Project Type
ZIP Codes
Jump to Top