Braddock / Helen

Current Phase:

Start:

Estimated Fall 2024

Completion:

Estimated Winter 2025

Overview

Project #40926 Braddock / Helen will replace water and sewer mains in the Harrowgate neighborhood of the River Wards section of Philadelphia.

The Water Department will have an assigned engineer and inspector for the project, who will be on-site every day. For on-site problems/questions, please talk with the inspector or engineer on the job site. Contact information will be listed below when construction is nearing.

Water shut-offs are required for this work and typically start at 9am, lasting 2 to 8 hours.

Streets Affected

  • Helen St. from E. Ontario St. to E. Tioga St.
  • Braddock St. from E. Tioga St. to E. Atlantic St.
  • Joyce St. from E. Schiller St. to E. Venango St.
  • Amber St. from E. Ontario St. to E. Tioga St.
  • E. Schiller St. from Frankford Ave. to Braddock St.
  • E. Atlantic St. from Frankford Ave. to Emerald St.
  • Kingston St. from Frankford Ave. to Amber St.
For worksite issues, contact:
For more information, contact:

Project #40926

Project Type
ZIP Code

Project Files

40926 Construction LetterJuly 25, 2024