Project #40933 Atlantic / Estaugh will replace water and sewer mains and install green stormwater infrastructure in the Nicetown–Tioga
neighborhood. Work is estimated to start in 2025.
The map above shows where new water mains will be installed and the service lines connected to the new mains. These properties may experience limited water interruptions during construction.
An assigned PWD inspector and engineer will be on-site and can answer questions about the work. Inspector and engineer contact information will be listed below when construction is nearing.
Streets Affected
- W. Atlantic St. from N. 21st St. to N. 23rd St.
- W. Estaugh St. from N. 20th St. to N. 21st St.
- N. 20th St. from W. Ontario St. to W. Venango St.
- N. 21st St. from W. Ontario St. to W. Tioga St.
For worksite issues, contact:
- Anoop George
Project Engineer
george.anoop@phila.gov
215-301-5494 - Dave Pandya
Division Engineer
Dave.Pandya@phila.gov
215-685-6352
For more information, contact:
- Amy Hopf
PWD Construction Liaison
water.construction@phila.gov