Atlantic / Estaugh

Current Phase:

Overview

Project #40933 Atlantic / Estaugh will replace water and sewer mains and install green stormwater infrastructure in the Nicetown–Tioga
neighborhood. Work is estimated to start in 2025.

The map above shows where new water mains will be installed and the service lines connected to the new mains. These properties may experience limited water interruptions during construction.

An assigned PWD inspector and engineer will be on-site and can answer questions about the work. Inspector and engineer contact information will be listed below when construction is nearing.

For more information, contact:

Project #40933

Project Type
ZIP Code
Council District
Jump to Top