Upper Cresheim Tunnel Repair
Current Phase: Design
Overview
Project #40977 Upper Cresheim Tunnel Repair is an ecological restoration project that will take place in Wissahickon Park in Northwest Philadelphia.
This work includes:
- Stormwater outfall reconstruction
- Replace and protect water main infrastructure
- Sanitary sewer lining
- Streambank stabilization and grade control
To learn more about PWD’s Ecological Restoration efforts, visit water.phila.gov/sustainability/ecorestoration.
For more information, contact:
- Kevin Malley
Project Engineer
Kevin.Malley@phila.gov