Fitzgerald / American

Current Phase:

Start:

Estimated Mid Fall 2024

Completion:

Estimated July 2025

Overview

Project #40981 Fitzgerald / American will replace water and sewer mains in the Whitman neighborhood of South Philadelphia.

The Water Department will have an assigned engineer and inspector for the project, who will be on-site every day. For on-site problems/questions, please talk with the inspector or engineer on the job site. Contact information will be listed below when construction is nearing.

Water shut-offs are required for this work and typically start at 9am, lasting 2 to 8 hours.

Streets Affected

  • Fitzgerald St. from S. 5th St. to S. 3rd St.
  • S. American St. from Ritner St. to Wolf St.
  • Daly St. from S. 2nd St. to S. Front St.
  • S. Reese St. from Shunk St. to Porter St.
For worksite issues, contact:
For more information, contact:

Project #40981

Project Type
ZIP Code
Council District

Project Files

40981 Construction LetterJuly 18, 2024