,

Venango / Stouton

Current Phase:

Start:

Estimated Fall 2024

Completion:

Estimated June 2025

Overview

Project #41048 Venango / Stouton will replace water and sewer mains in the Harrowgate neighborhood of the River Wards section of Philadelphia.

The Water Department will have an assigned engineer and inspector for the project, who will be on-site every day. For on-site problems/questions, please talk with the inspector or engineer on the job site. Contact information will be listed below when construction is nearing.

Water shut-offs are required for this work and typically start at 9am, lasting 2 to 8 hours.

Streets Affected

  • E. Venango St. from Kensington St. to Frankford Ave.
  • Stouton St. from E. Venango St. to Atlantic St.
For worksite issues, contact:
For more information, contact:

Project #41048

Project Type
ZIP Code

Project Files

41048 Construction LetterJuly 25, 2024
Jump to Top