Brewerytown, North Philadelphia
Nicholas / Judson
Overview
Project #41070 Nicholas / Judson will replace water and sewer mains and install green stormwater infrastructure in the Brewerytown neighborhood. Work is estimated to start in 2025.
The map above shows where new water mains will be installed and the service lines connected to the new mains. These properties may experience limited water interruptions during construction.
An assigned PWD inspector and engineer will be on-site and can answer questions about the work. Inspector and engineer contact information will be listed below when construction is nearing.
For worksite issues, contact:
- William Rush
Project Engineer
William.Rush@phila.gov
215-200-4134 - Gary Seifert
Division Engineer
Gary.J.Seifert@phila.gov
215-685-6363
For more information, contact:
- Amy Hopf
PWD Construction Liaison
water.construction@phila.gov