Mifflin / Watkins

Current Phase:

Start:

September 2024

Completion:

Estimated Early 2026

Overview

Project #41128 Mifflin / Watkins will replace water mains and sewer pipes in South Philadelphia. See the streets listed below to learn which streets will be water main work vs. water and sewer work.

Sewer lining work will be done on Mifflin St. from S. 8th St. to S. 7th St. Watch a video on how this sewer lining work is done.

The Water Department has assigned an engineer and inspector to the project who will be on-site every day. For on-site problems or questions about the work, please talk with the inspector or engineer on the job site. Contact information is listed below.

Water shut-offs are required for this work and typically start at 9am, lasting 2 to 8 hours.

Streets Affected

  • S. 8th St. from Mifflin St. to Morris St. (Water Main Work Only)
  • Pierce St. from S. 9th St. to S. 8th St. (Water Main Work Only)
  • Watkins St. from S. 9th St. to S. 8th St. (Water Main Work Only)
  • Sigel St. from S. 8th St. to S. 7th St. (Water Main Work Only)
  • McClellan St. from S. 9th St. to S. 7th St. (Water Main Work Only)
  • Morris St. from S. 11th St. to S. 7th St. (Water Main Work Only)
  • Dickinson St. from S. 9th St. to S. 7th St. (Water Main Work Only)
  • Beulah St. from Tasker St. to Dickinson St. (Water Main Work Only)
  • Franklin St. from Mountain St. to Tasker St. (Water Main Work Only)
  • Pierce St. from S. 8th St. to S. 7th St. (Water & Sewer Work)
  • Watkins St. from S. 8th St. to S. 7th St. (Water & Sewer Work)
  • Franklin St. from Dickinson St. to Dead End: Water & Sewer Work
  • League St. from S. 6th St. to S. Fairhill St. (Water & Sewer Work)
  • S. Fairhill St. from League St. to Carpenter St. (Water & Sewer Work)
  • Mifflin St. from S. 8th St. to S. 7th St. (Sewer Lining Work)
For worksite issues, contact:
For more information, contact:

Project #41128

Project Type
ZIP Code
Council District

Project Files

41128 General Construction LetterJune 21, 2024