Columbia / Belgrade

Current Phase:

Start:

July 2024

Completion:

Estimated Spring 2026

Overview

Project #41130 Columbia / Belgrade will replace water mains and sewer pipes in the Fishtown neighborhood.

Sewer lining work will be done on Memphis St. from E. Columbia St. to E. Palmer St. Watch a video on how this sewer lining work is done.

The Water Department has assigned an engineer and inspector to the project who will be on-site every day. For on-site problems or questions about the work, please talk with the inspector or engineer on the job site. Contact information is listed below.

Water shut-offs are required for this work and typically start at 9am, lasting 2 to 8 hours.

Streets Affected

  • E. Columbia St. from E. Thompson St. to Frankford Ave.
  • Belgrade St. from E. Columbia St. to E. Montgomery Ave.
  • Orange St. from Belgrade St. to Miller St.
  • Emerick St. from Belgrade St. to Miller St.
  • Miller St. from Orange St. to Emerick St.
  • E. Eyre St. from Frankford Ave. to Memphis St.
  • Memphis St. from E. Columbia St. to E. Palmer St. (Sewer Lining Work)
For worksite issues, contact:
For more information, contact:

Project #41130

Project Type
ZIP Code

Project Files

41130 General ConstructionJune 21, 2024