Columbia / Belgrade

Current Phase:

Start:

July 2024

Completion:

Estimated Spring 2026

Overview

Project #41130 Columbia / Belgrade will replace water mains and sewer pipes in the Fishtown neighborhood.

Sewer lining work will be done on Memphis St. from E. Columbia St. to E. Palmer St. Watch a video on how this sewer lining work is done.

The Water Department has assigned an engineer and inspector to the project who will be on-site every day. For on-site problems or questions about the work, please talk with the inspector or engineer on the job site. Contact information is listed below.

Water shut-offs are required for this work and typically start at 9am, lasting 2 to 8 hours.

Streets Affected

Street Segment Type of Work
E. Columbia St. from E. Thompson St. to Frankford Ave.
Belgrade St. from E. Columbia St. to E. Montgomery Ave.
Orange St. from Belgrade St. to Miller St.
Emerick St. from Belgrade St. to Miller St.
Miller St. from Orange St. to Emerick St.
E. Eyre St. from Frankford Ave. to Memphis St.
Memphis St. from E. Columbia St. to E. Palmer St. (Sewer Lining Work)
For worksite issues, contact:
For more information, contact:

Project #41130

ZIP Code

Project Files

41130 General ConstructionJune 21, 2024
Jump to Top