East Parkside, West Philadelphia
East Parkside Streets
Overview
Project #50194 (East Parkside Streets) will implement green infrastructure to improve the stormwater management in the East Parkside neighborhood. This is part of the overall Green Stormwater Infrastructure Initiative called Green City, Clean Waters.
Streets Affected
- N. 39th St. from Cambridge St. to Poplar St.
- Cambridge St. from N. Union St. to N. Sloan St.
- Poplar St. from N. 40th St. to N. 41st St.
- Poplar St. from N. Union St. to N. Sloan St.
- N. 41st St. from W. Girard Ave. to Viola St.
- N. 41st St. from W. Girard Ave. to Cambridge St.
- Cambridge St. from Poplar St. to N. 41st St.
For worksite issues, contact:
- Kevin Rupnarine
Inspector (on-site)
kevin.rupnarine@phila.gov
267-269-7161 - Frank Stollenwerk
Project Engineer
Francis.Stollenwerk@phila.gov
215-964-8036 - Jim Giffear
Division Engineer
Jim.Giffear@phila.gov
215-380-2132
For more information, contact:
- Amy Hopf
PWD Construction Liaison
water.construction@phila.gov - Dan Schupsky
GSI District 2 Community Outreach Specialist
daniel.schupsky@phila.gov