Fanshawe / Longshore
Overview
Project #20483 (Fanshawe / Longshore) will replace water mains in the Lawndale neighborhood.
Streets Affected
- Longshore Ave. from Rising Sun Ave. to Oxford Ave. (Water Main / GSI)
- Glenview St. from Bingham St. to Oxford Ave. (Water Main / GSI)
- Bingham St. from Longshore Ave. to Glenview St. (Water Main)
- Bingham St. from Knorr St. to Kerper St. (Water Main)
- Kerper St. from Rising Sun Ave. to Bingham St. (Water Main)
- Unruh Ave. from Rising Sun Ave. to Bingham St. (Water Main)
- Fanshawe St. from Rising Sun Ave. to Bingham St. (Water Main)
- Gilham St. from Rising Sun Ave. to Bingham St. (Water Main)