Magee / Gilham

Current Phase:

Overview

Project #20578 Magee / Gilham will replace water mains and install green stormwater infrastructure in the Tacony neighborhood. Work is estimated to start in 2025.

The map above shows where new water mains will be installed and the service lines connected to the new mains. These properties may experience limited water interruptions during construction.

An assigned PWD inspector and engineer will be on-site and can answer questions about the work. Inspector and engineer contact information will be listed below when construction is nearing.

For more information, contact:

Project #20578

Project Type
ZIP Code
Jump to Top