Magee / Gilham

Current Phase:

Start:

January 2025

Completion:

Estimated Spring 2026

Overview

Project #20578 Magee / Gilham will replace water mains and install green stormwater infrastructure in the Tacony neighborhood. Work is estimated to start in 2025.

The map above shows where new water mains will be installed and the service lines connected to the new mains. These properties may experience limited water interruptions during construction.

An assigned PWD inspector and engineer will be on-site and can answer questions about the work. Inspector and engineer contact information will be listed below when construction is nearing.

Streets Affected

  • Magee Ave. from Walker St. to Charles St.
  • Gilham St. from Erdrick St. to Frankford Ave.
  • Erdrick St. from Gilham St. to Hellerman St.
  • Greeby St. from Walker St. to Erdrick St.
  • Algard St. from Magee Ave. to Hellerman St.
  • Hellerman St. from Algard St. to Walker St.
  • Walker St. from Passmore St. to Levick St.
  • Elbridge St. from Walker St. to Frankford Ave.
  • Erdrick St. from Magee Ave. to Gilham St.
For worksite issues, contact:
For more information, contact:

Project #20578

Project Type
ZIP Code

Project Files

#20578 Construction LetterMarch 25, 2025