Northeast Philadelphia, Tacony
Magee / Erdrick / Gilham
Overview
Project #20578 Magee / Gilham will replace water mains and install green stormwater infrastructure in the Tacony neighborhood. Work on the project began in January 2025.
The map above shows where new water mains will be installed and the service lines connected to the new mains. These properties may experience limited water interruptions during construction.
During construction, an assigned PWD inspector and engineer will be on-site and can answer questions about the work.
For more information, please email the PWD community outreach team at water.projects@phila.gov. Please specify the project name, project number, and ZIP code in your email.
Streets Affected
| Street | Segment | Type of Work |
|---|---|---|
| Magee Ave. | from Walker St. to Charles St. | |
| Gilham St. | from Erdrick St. to Frankford Ave. | |
| Erdrick St. | from Gilham St. to Hellerman St. | |
| Greeby St. | from Walker St. to Erdrick St. | |
| Algard St. | from Magee Ave. to Hellerman St. | |
| Hellerman St. | from Algard St. to Walker St. | |
| Walker St. | from Passmore St. to Levick St. | |
| Elbridge St. | from Walker St. to Frankford Ave. | |
| Erdrick St. | from Magee Ave. to Gilham St. |
For worksite issues, contact:
- Ephrem Gebremichael
Inspector (on-site)
ephrem.gebremichael@phila.gov
267-475-0788 - Gary Seifert
Division Engineer
Gary.J.Seifert@phila.gov
215-685-6363