Northwood - Phase 2

Current Phase:

Overview

Project #20645 Northwood – Phase 2 is a planned PWD project in Northeast Philadelphia. It will build new water mains and green stormwater infrastructure.

An assigned PWD inspector and engineer will be on-site and can answer questions about the work. Construction contact information, timelines, and streets affected will be listed here when construction is nearing.

Streets Affected

  • Enola St.
  • Gilham St. from Enola St. to end
  • Knorr St. from Algon Ave. to Summerdale Ave.
  • Kerper St. from Algon Ave. to Summerdale Ave.
  • Unruh Ave. from Algon Ave. to Summerdale Ave.
  • Algon Ave. from Knorr St. to Unruh Ave.
  • Summerdale Ave. from Knorr St. to Unruh Ave.
  • Dorcas St. from Magee Ave. to Levick St.
  • Hellerman St. from Algon Ave. to Dorcas St. end
  • Algon Ave. from Magee Ave. to Levick St.
  • Gilham St. from Summerdale Ave. to Algon Ave.
For more information, contact: