,

Northwood - Phase 3

Current Phase:

Overview

Project #20680 Northwood – Phase 3 is a planned PWD project in Northeast Philadelphia. It will build new water mains and green stormwater infrastructure.

An assigned PWD inspector and engineer will be on-site and can answer questions about the work. Construction contact information, timelines, and streets affected will be listed here when construction is nearing.

Streets Affected

  • Algon Ave from Devereaux Ave to Levick St
  • Robbins St from Algon Ave to Langdon St
  • Elmhurst St from Robbins St to Levick St
  • Langdon St from Robbins St to Levick St
  • Langdon St from Devereaux Ave to Robbins St
  • Trotter St from Deveraux Ave to Robbins St
  • Trotter St from Robbins St to Levick St
For more information, contact:
Jump to Top