Northwood - Phase 3

Current Phase:

Overview

Project #20680 Northwood – Phase 3 is a planned PWD project in Northeast Philadelphia. It will build new water mains and green stormwater infrastructure.

An assigned PWD inspector and engineer will be on-site and can answer questions about the work. Construction contact information, timelines, and streets affected will be listed here when construction is nearing.

Streets Affected

Street Segment Type of Work
Algon Ave from Devereaux Ave to Levick St
Robbins St from Algon Ave to Langdon St
Elmhurst St from Robbins St to Levick St
Langdon St from Robbins St to Levick St
Langdon St from Devereaux Ave to Robbins St
Trotter St from Deveraux Ave to Robbins St
Trotter St from Robbins St to Levick St