N. 62nd Street

Current Phase:

Start:

April 2024

Completion:

Estimated September 2024

Overview

Project #41233 N. 62nd Street is an emergency water and sewer replacement project. The work will replace the broken water main along N 62nd St in the Overbrook neighborhood.

The Water Department has assigned an engineer and inspector to the project who will be on-site every day. For on-site problems or questions about the work, please talk with the inspector or engineer on the job site. Contact information is listed below.

Water shut-offs are required for this work and typically start at 9am, lasting 2 to 8 hours.

Streets Affected

  • N. 62nd St. from Lebanon Ave. to Lancaster Ave.
For worksite issues, contact:
For more information, contact:

Project #41233

Project Type
ZIP Code

Project Files

41233 General Construction LetterJune 21, 2024