Development Services Unit Updates
Updated Utility Plan Review (UPR) Checklist
The Utility Plan Review (UPR) Checklist has been updated to clarify existing requirements. These updates include:
- Specifying that proposed Private Infrastructure follow the easement requirements of the Plumbing Code.
- Adding a requirement to show all encroachments, whether temporary or permanent, within a public Right-of-Way or PWD Drainage Right-of-Way. This includes temporary construction features such as fencing, material and equipment storage.
- Specifying that proposed egress wells within the Right-of-Way must have a minimum horizontal clearance of 10’ from PWD infrastructure. In addition, proposed overhangs within 5’ of any PWD utility must have at least 13’-6” vertical clearance, or 2 times the depth of the nearest utility (whichever value is greater).
- Requiring field change submissions made during active construction to label all constructed features on the plan.
The updated checklist should be used immediately for all new submissions, resubmissions, and field changes.
As a reminder, when making a field change submission through the pwdplanreview.org portal, the required memo should indicate what changes have been made to the plan since the previous approval and the project construction status. Projects in active construction must also include a summary of constructed features.
View the checklist and for more information on Utility Plan Review
New Resource! Working in the Street: Excavation and Access near PWD Infrastructure
PWD recently created a factsheet for plumbers and contractors to provide guidance when working near PWD infrastructure. The factsheet can be found in PWD’s Resources Guide.
New Resource! Residential Water Service Arrangements Diagram
PWD, with the assistance of the Department of Licenses and Inspections, has created a diagram on allowable domestic and fire service connection configurations by building type. This diagram can be found in PWD’s Resources Guide.
New Resource! PWD Development Services Phone Line: 215-685-0798
In the last newsletter PWD announced the creation of the Development Services website and email account. We are pleased to announce that a phone line has also been established that will be staffed during standard business hours to answer questions specific to PWD Development Services including permits, prerequisite approvals, and inspections. To reach PWD Development Services call 215-685-0798.