
Resource Directory
News
-
GSI, WSG, ER, and W/S Master Specifications with Change Log and Request Form – Updates tracked in a new Change Log for specification updates. Form developed to receive requests for specification updates.
ER Survey & Soil Testing Doorhanger – New version for ER projects, printed versions available for pickup.
Survey & Soil Testing Prep Instructions – Provided information for new ER doorhanger, updated timing, contacts, and general instructions for email notification, doorhanger distribution, and how to proceed with Make Work Site Safe requests.
GSSD Construction Submittal and As-Built Review Guidance – Minor updates for revised soil review process.
As-Built Metrics Tracking Procedure – Added requirement for entering not-constructed projects once known, improved navigability of document including checklist.
Review Contacts – Updated PP&R contacts, TP&A submission requirements, and clarification on Streets ROW submission.
PP&R Documents – Updated permit application and insurance requirements.
-
GreenIt Data Entry Application – Updated validation rules and default settings.
Survey & Soil Testing Doorhanger – Updated wording and new printed version availability.
Survey & Soil Testing Prep Instructions – Updated email notification instructions.
-
Post-Design Support Resources – Updated, created, and reformatted numerous resources used during the post-design support phase, including project status reporting documentation.
GSI As-Built Survey & Drafting Manual – Updated example as-builts, CAD template files.
GSI & WSG Master Specifications – Added language/table for new parking signage at bumpouts, minor updates to contacts and editing guidance comments.
Review Contacts – Updated Philadelphia Parks and Recreation contacts and submission details, Updated PWD Operations contacts.
-
Survey & Soil Testing Prep Instructions – Added FAQ about coordinating blanket shielding with PECO. Renamed to indicate document isn’t solely focused on doorhangers. Updated PWD Outreach Specialist district contacts.
Review Contacts – Updated Philadelphia Parks and Recreation (For Park Projects) contacts.
-
GSI & WSG Master Specifications – Updated version of master specifications file, now consistent with Water/Sewer files
GSI Bid Item List/Engineering Estimate Template – Updated unit costs and estimate template
Streets Design Guidance for GSI Projects – Updated ADA passing width guidance and referenced Streets Department’s new bumpout grading plan detail
Design Review Checklists – Removed Project Summaries as a required submission
Resource Directory
A complete catalogue of all resources needed to provide GSI planning & design services to PWD. The majority of the resources can be downloaded directly from the website, though some are distributed upon request by the PWD project manager.