
Resource Directory
News
-
Invoice Package – Changed the template and Task Breakdown page to include Task Order (TO) tracking, with additional information on TO tracking and service types. Also updated Unit name and instructions for common errors.
GSI Survey and Drawing Standards – Updated Tree Component ID language and display. Also updated formatting of Plant Schedules.
GSI Substantially Complete (70%) Submission Completion Checklist – Added requirements to submit 50% TP&A (Utility Paving Restoration) letter and 50% ROW Review letter (if applicable).
-
GSI, WSG, ER, and W/S Master Specifications with Change Log and Request Form – Updates tracked in a new Change Log for specification updates. Form developed to receive requests for specification updates.
ER Survey & Soil Testing Doorhanger – New version for ER projects, printed versions available for pickup.
Survey & Soil Testing Prep Instructions – Provided information for new ER doorhanger, updated timing, contacts, and general instructions for email notification, doorhanger distribution, and how to proceed with Make Work Site Safe requests.
GSSD Construction Submittal and As-Built Review Guidance – Minor updates for revised soil review process.
As-Built Metrics Tracking Procedure – Added requirement for entering not-constructed projects once known, improved navigability of document including checklist.
Review Contacts – Updated PP&R contacts, TP&A submission requirements, and clarification on Streets ROW submission.
PP&R Documents – Updated permit application and insurance requirements.
-
GreenIt Data Entry Application – Updated validation rules and default settings.
Survey & Soil Testing Doorhanger – Updated wording and new printed version availability.
Survey & Soil Testing Prep Instructions – Updated email notification instructions.
-
Post-Design Support Resources – Updated, created, and reformatted numerous resources used during the post-design support phase, including project status reporting documentation.
GSI As-Built Survey & Drafting Manual – Updated example as-builts, CAD template files.
GSI & WSG Master Specifications – Added language/table for new parking signage at bumpouts, minor updates to contacts and editing guidance comments.
Review Contacts – Updated Philadelphia Parks and Recreation contacts and submission details, Updated PWD Operations contacts.
-
Survey & Soil Testing Prep Instructions – Added FAQ about coordinating blanket shielding with PECO. Renamed to indicate document isn’t solely focused on doorhangers. Updated PWD Outreach Specialist district contacts.
Review Contacts – Updated Philadelphia Parks and Recreation (For Park Projects) contacts.
Resource Directory
A complete catalogue of all resources needed to provide GSI planning & design services to PWD. The majority of the resources can be downloaded directly from the website, though some are distributed upon request by the PWD project manager.