| Drainage Area Plan(s) | - Predevelopment and post-development drainage areas (including any off-site area)
 - Location of point(s) of analysis (POA)
 - Pertinent existing stormwater infrastructure necessary to define existing drainage conditions
 
  | 
Inlet Drainage Area Plan | - Predevelopment and post-development inlet drainage area delineations (including any roof leaders)
 - Calculated areas of drainage and time of concentration to each inlet
 - Impervious and pervious cover and runoff coefficients within each drainage area
 
  | 
| PWD Stormwater Plan Review Online Technical Worksheet | - PDF printout of completed Online Technical Worksheet. For submissions via the Project Dashboard on the PWD Stormwater Plan Review website, a PDF is automatically generated and submitted.
 
  | 
| Geotechnical Report | - Signed and sealed by a Professional Engineer
 - Detailed description of testing procedure and materials/apparatus used
 - Weather information at time of testing and previous 24 hours (temperature, rainfall, etc.)
 - Engineer’s analysis and summary of all results including soil classification (in accordance with ASTM D2488) and site evaluation
 - Engineer’s affirmative or negative recommendation on feasibility of infiltration, with justification
 - Infiltration Testing and Soil Characterization Plan (including, but not limited to, topographic/existing features of the site showing location of test pits/borings and infiltration tests)
 - Field boring/test pit logs for soil profiling
 - Infiltration Testing Log (Appendix H provides a template, which shows minimum level of information that must be provided)
 - Sieve analysis results per ASTM D422-63, down to No. 200 sieve, and USCS classification per ASTM D2487 of each sample
 - Photographs of testing
 
  | 
| Media Filter Design Documentation | - Inflow and outflow event mean concentrations and percent removals for Total Suspended Solids (TSS) for sand/media filters (Designs must demonstrate a maximum effluent event mean concentration of 15 milligrams per liter for TSS at a POA downstream of the SMP)
 - Third-party certifications for proprietary media filters
 - Hydrologic and hydraulic model files, if applicable
 - Product specifications for proprietary media filters
 - Manufacturer’s guidelines for installation for proprietary media filters
 - Construction sequence
 - Maintenance requirements, including product life and replacement schedule, if applicable
 
  | 
| Low Flow Device Design Documentation | - Performance/discharge curves
 - Third-party certifications
 - Hydrologic and hydraulic model files, if applicable
 - Product specifications
 - Manufacturer’s guidelines for installation
 - Construction sequence
 - Maintenance requirements, including product life and replacement schedule, if applicable
 
  | 
| SMP Maintenance Guide (Appendix G) | - SMP Maintenance Guide Introduction
- Customized, from the third page of the SMP Maintenance Guide Information document provided in Appendix G, to be site-specific
 - Provides under its cover an SMP Maintenance Guide Site Map and SMP Maintenance Schedule Forms
 
  - SMP Maintenance Guide Site Map
- Identifies the on-site SMPs and key SMP-related features which require maintenance, using unique, legible, labels, and provides a list of structures and SMP-related features, identifying the associated SMP(s) for each
 - Includes a Color Legend that adheres to the Color Legend provided in the SMP Maintenance Guide document provided in Appendix G
 - Sized 11” x 17” (Multiple sheets may be used, if necessary)
 - Consistent in format with the SMP Maintenance Guide Sample’s Site Map, provided in Appendix G
 
  - SMP Maintenance Schedule Forms
- Customized from the templates provided in Appendix G to be site-specific for each proposed SMP
 - Provide for inspection of each SMP and SMP-related structure, including routine maintenance, repair, and replacement
 - Provide for a report documenting each inspection and all SMP maintenance activities performed as a result of the inspections
 
  
  | 
| Construction Certification Package with Customized SMP Construction Certification Forms (Appendix J) | - One site-specific SMP Construction Certification Form for each SMP
 
  | 
| Proof of Applicable State and/or Federal Permits | - Typical permits (as applicable):
- Pennsylvania Code and Charter Chapter 102 NPDES National Pollutant Discharge Elimination System Phase II Permit for Construction Activities
 - Pennsylvania Code and Charter Chapter 105: Water Obstruction and Encroachment General and Joint Permits
 - Other applicable permits (Sections 2.5, 2.6, and 2.7 provide resources to assist in determining which permits may apply)
 
  - Proof of issuance is required for PWD sign-off on a Building Permit; however, the applicant must only prove that they have applied for all applicable permits via copies of permit applications, application receipts, or notification letters from relevant agencies
 - For Pennsylvania Land Recycling Program (Act 2) sites, proof of notice to PA DEP for both an intent to remediate and notification of work to an existing Act 2 site is required
 
  |