Chapter 4, Stormwater Management Practice Guidance, provides detailed guidance to the designer regarding stormwater management practices (SMPs) as well as pretreatment, inlet and outlet control systems, and landscaping that support SMP functions.

4.0.2 Chapter Organization

The SMPs in this Chapter are presented in order of PWD preference according to the SMP Hierarchy (Section 3.2.2). Several SMPs in this Chapter are on PWD’s list of acceptable non-infiltrating pollutant-reducing practices (Section 3.1.7).

This chapter consists of guidance and requirements for the following SMPs:

Additionally, this chapter contains guidance and requirements for the following types of systems that support SMP function:

Each SMP section in this chapter is organized into subsections that contain the following information:

  • Introduction – Introduces the SMP; gives examples of when the SMP can be used; and describes key advantages, limitations, and design considerations.
  • Components – Describes the typical SMP pretreatment, inlet control, storage area, outlet control, and inspection and maintenance access components, as applicable.
  • Design Standards – Lists all SMP design requirements, denoted by easy-to-reference numerals.
  • Material Standards – List all SMP material specifications and requirements, denoted by easy-to-reference numerals.
  • Construction Guidance – Provides guidance related to SMP construction.
  • Maintenance Guidance – Provides guidance on SMP maintenance activities and frequencies, including a recommended SMP maintenance schedule.

4.0.3 Design Innovation

SMPs contained in this Chapter are by no means exclusive. PWD encourages the development of innovative practices that meet the intent of the Stormwater Regulations. PWD recognizes that new stormwater management systems and products are being developed continuously and is in support of innovative approaches to management. The designer is encouraged to request a pre-application meeting with PWD Stormwater Plan Review early in the approval process to discuss PWD’s standard SMP design requirements or if the designer wishes to use new or non-standardized technologies to meet the Stormwater Regulations.