F.2 Post-Construction Stormwater Management Plan

  Print / Download

F.2.1 PCSMP drawings

  1. General
  2. Existing Conditions Plan
  3. Details
  4. Drainage Area Plans

F.2.2 Grading design

  1. Verify that the proposed grading is provided. [Section 2.3.1]
  2. Verify that all DCIA within the project’s limit of earth disturbance is captured, especially at the site’s ingress and egress areas. [Section 1.2.1; Section 3.4.1]

F.2.3 Utilities and storm sewer design

  1. Verify that the length, material, size, and slope of all piping associated with stormwater conveyance and roof drainage systems are clearly labeled on the plans. [Section 3.4.2]
  2. Verify that pipe lengths, slopes, and inverts are accurate. Compare pipe information to profiles, if provided, for consistency. [Section 3.4.2]
  3. If roof runoff isolation is proposed as a non-infiltrating pollutant-reducing practice, verify that the runoff discharges into a combined sewer and that the runoff is routed from a non-vehicular roof area that is not commingled with untreated runoff. [Section 3.1.7]
  4. Verify that no piping conflicts exist. [Section 3.4.2]
  5. Verify that inlets are not connected in series. Wye connections, or similar, may be used to ensure that inlets are offline. [Section 3.4.2]
  6. Verify that roof drainage systems do not tie directly into an inlet. [Section 3.4.2]
  7. Verify the separation distance between all utility crossings. A minimum of 12 inches of vertical clearance is required when a sanitary sewer line crosses above a storm sewer line. The sanitary sewer must be encased in concrete if the clearance is less than 12 inches. [Section 3.4.2]
  8. Verify that any manholes between outlet structures and sewer connections in combined sewer areas have sanitary (non-vented) covers. [Section 3.4.2]
  9. Verify that a cleanout is provided, at minimum, every 100 feet, at the end of all pipes, and for all 90-degree pipe bends in the storm sewer system and that a cleanout detail is provided on the plans. [Section 3.4.2]
  10. If curb cuts or non-standard inlets are used to capture runoff, especially from driveways or roadways where the inlets are not in a sump condition, verify that the one‑year, 24‑hour storm event will be captured by the inlet. [Section 3.4.2]
  11. Verify that the invert elevation(s) for the proposed connection(s) to the existing City sewer is/are specified. [Section 3.4.2]
  12. Verify that the outlet culvert(s) is/are right-sized to minimize impacts on PWD infrastructure. [Section 3.4.2]
  13. Verify that all stormwater conveyance pipe material is in compliance with the City of Philadelphia Plumbing Code (Plumbing Code). [Section 3.4.2]
  14. Verify that a minimum cover of 36 inches is provided over all private storm sewer pipes, in accordance with the Plumbing Code. [Section 3.4.2]
  15. Verify that stormwater conveyance pipes are designed with a minimum velocity of two feet per second. Designs should attempt to maintain velocity without sacrificing SMP depth. [Section 3.4.2]
  16. Verify that all proposed connections to the City sewer are right-sized to convey the necessary flow while minimizing the pipe diameter. [Section 3.4.2]
  17. Verify that all proposed connections to the City sewer will be inspected by PWD Water Transport Records. Instructions for obtaining a sewer connection permit can be found on the Water & Sewer Permits page. Refer to Section 2.5 for more information on Water Transport Records. [Section 3.4.2]
  18. Verify that at least two feet of clearance between the bottom of the SMP and the crown of the City sewer pipe, and/or a backflow prevention device, is provided to alleviate potential flooding from the City sewer which is regularly at full capacity. [Section 3.4.2]
  19. Verify that Private Cost plans are submitted to the PWD Design Branch for review, if applicable. Refer to Section 2.5 for more information on Private Cost project requirements. [Section 2.5]
  20. Verify that a copy of the plans is submitted to the Department of Licenses and Inspections (L&I) for review if the project proposes an oil/water separator. Refer to Section 2.6 for more information on L&I permitting. [Section 2.6]
  21. Verify that stormwater conveyance piping and SMPs are not receiving runoff from fueling station pads for gas stations. The drainage area under a pad’s canopy must be treated by an oil/water separator then discharge directly to the sanitary sewer system. [Section 3.4.2]
  22. Verify that any project which proposes stormwater conveyance piping or SMPs that encroach onto an adjacent property has obtained a drainage easement. [Section 3.4.2]
  23. Verify that any abandoned length of sewer within 20 feet of the boundaries of a proposed SMP is proposed to be either removed or filled with controlled density fill (flowable fill) and bulkheaded and meet the following specifications. [Section 3.4.2]
  24. Verify that any abandoned sewer inlet connection is proposed to be cut and capped at least five feet from the exterior of the inlet and meet the following specifications. [Section 3.4.2]
  25. Verify that the distance between any active length of building sewer, private sewer, or public sewer and the boundaries of a proposed SMP is at least 20 feet from the outside of the pipe, unless vertical clearance is provided between the bottom of the sewer and the top of the SMP. It is acceptable for SMPs to be located directly adjacent to the public right-of-way (ROW). [Section 3.4.2]
  26. Verify that the distance between any active inlets or laterals, whether publicly or privately owned, and the boundaries of a proposed SMP is at least ten feet from the outside of the structure or pipe, unless the inlets or laterals drain to the SMP. It is acceptable for SMPs to be located directly adjacent to the public ROW. [Section 3.4.2]
  27. Verify that, for all pipes entering or exiting the proposed SMP storage media, an anti-seep collar (either a prefabricated anti-seep collar or bentonite clay trench dam) is provided and is sufficiently sized and distanced from the edge of the storage media, where space allows, to prevent water from traveling along the outside of the pipes. [Section 3.4.2]
  28. If an existing SMP, above or below ground, is located within 25 feet of the LOD and proposed to remain, verify that the applicant has provided an affirmative statement confirming there will not be a conflict between the existing SMP and the proposed design shown on the plans. [Appendix E, Table E‑5]

F.2.4 PCSMP Report

  1. Verify that the PCSMP Report meets all of the specific PCSMP Report requirements listed in Appendix E, Table E‑7. [Section 2.3.1]
  2. Verify that the PCSMP Report is signed and sealed by a Professional Engineer licensed in the Commonwealth of Pennsylvania. [Section 2.3.1; Appendix E, Table E‑7]
  3. Verify that the PWD Stormwater Plan Review Online Technical Worksheet is completed, as necessary, and submitted with the PCSMP Review Phase Submission Package. [Section 3.4.1; Appendix E, Table E‑7]
  4. Operations and Maintenance Agreement
  5. Construction Certification Package
  6. Verify that proof of application for applicable State and Federal permits is submitted with the PCSMP Review Phase Submission Package. This can be in the form of copies of permit applications, application receipts, or notification letters from relevant agencies. Applicable State permits include, but are not limited to, a PA DEP NPDES Permit if one acre or more of earth disturbance activity is proposed. [Section 2.3.1; Appendix E, Table E‑7]
  7. Verify that a discussion on proposed Stormwater Management Banking and Trading is provided, if applicable. [Section 3.2.4; Appendix E, Table E‑7]
  8. Verify that a discussion on proposed fee in lieu is provided, if applicable. [Section 3.4.1; Appendix E, Table E‑7]